My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-30_PERMIT FILE - C1981019 (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2025-06-30_PERMIT FILE - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 9:35:07 AM
Creation date
7/1/2025 9:32:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
6/30/2025
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
Rule 4 Performance Standards
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-20 Revision Date: 4/9/25 <br /> Revision No.: MR-261 <br /> <br />The Taylor Pump Holding Pond was constructed within 100’ of Taylor Creek. The Taylor Pump <br />Holding Pond is utilized to manage water movement from Wilson Reservoir to the active <br />operation; therefore, an underground water pipeline that transports water to and the from the <br />Taylor Pump Holding Pond was also constructed at various locations within 100’ of Taylor <br />Creek as shown on Map 10C. Neither of these structures has impacted Taylor Creek, and neither <br />structure is expected to have any long term impacts to Taylor Creek. <br /> <br />A water diversion structure is constructed in Taylor Creek that allows Colowyo to divert water <br />from Taylor Creek to exercise a water right. This structure would be utilized even if mining was <br />not occurring at Colowyo, as Colowyo is the private surface landowner utilizing a privately held <br />water right structure. <br /> <br />A light use road that was a premine “ranch” road follows along Taylor Creek. This road is <br />utilized to access the West Pit, East Taylor, and West Taylor sediment ponds. The road has been <br />improved upon from its premine condition to allow equipment access for dredging activities and <br />continued environmental monitoring. The lower reach of the road where it begins off of the <br />paved haul road up to the East Taylor Pond, snakes in and out of the 100’ stream buffer zone off <br />of Taylor Creek. The upper reach from the East Taylor Pond to the West Taylor Pond is almost <br />exclusively within the 100’ stream buffer zone due to steep topography. To date this road has <br />not created any adverse impacts to Taylor Creek, and it is not anticipated to have any long term <br />impacts to Taylor Creek. <br /> <br />A light use road along the west side of Taylor Creek to access the 69 kV power line follows <br />along Taylor Creek from the Taylor Pump Holding Pond up to the crossing of Taylor Creek just <br />below the West Pit Pond. This road has been slight improved to access the power line. This <br />road comes into the 100’ stream buffer zone in several locations; however, due to the small <br />extent of the road and minor surface runoff from the road, it is not anticipated to have any long- <br />term impacts to the Taylor Creek. <br /> <br />The raw water pipeline to the Collom operation will be routed across Taylor Creek through an <br />elevated structure. An elevated structure minimizes impacts within the stream buffer zone versus <br />other routing options such as boring the pipeline under Taylor Creek, which requires large <br />trenches and greater ground disturbances for equipment to bore under both sides of Taylor <br />Creek. With the elevated structure small disturbances will occur within the stream buffer zone of <br />Taylor Creek. Prior to ground disturbing activities proper best management practices (silt fence <br />or other suitable sediment control measures) will be installed. Topsoil will be windowed and <br />concrete footers will be poured which will provide the base for the structural stability needed to <br />support the pipe over Taylor Creek. Once the pipe and structure steel is installed the limited <br />disturbance areas have the topsoil windrows spread back out and the areas will be seeded. <br />Sediment will be controlled during the construction of these structures and will negate any <br />impacts to Taylor Creek while the ground is disturbed. The sediment control structures will be <br />left in place after reclamation until a suitable vegetative cover has been achieved. The water <br />pipe line and associated infrastructure will not create any long term impacts to Taylor Creek. <br />