My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-30_PERMIT FILE - C1981019 (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2025-06-30_PERMIT FILE - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 9:35:07 AM
Creation date
7/1/2025 9:32:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
6/30/2025
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
Rule 4 Performance Standards
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-12 Revision Date: 4/9/25 <br /> Revision No.: MR-261 <br />4.05.7 Discharge Structures <br /> <br />The sedimentation ponds at Colowyo are designed to treat the 10-year, 24-hour storm event in <br />accordance with Rule 4.05.6(3)(a) or fully contain the 100-year, 24-hour event. As such, the <br />general operation of the ponds that are designed to discharge will be a passive discharge system <br />where water is allowed to discharge automatically as necessary. Ponds designed to the 100-year, <br />24-hour storm event will fully contain the storm event and be managed as non-discharging <br />structures. Colowyo will sample discharges as appropriate to remain in compliance with <br />applicable CDPS Permit requirements. Pond dewatering through a manual headgate may be <br />performed as necessary to lower the water level depending on operational requirements. Manual <br />dewatering of ponds will meet applicable CDPS Permit standards. Discharge from sedimentation <br />ponds will be controlled by energy dissipaters and flow check devices where necessary. All <br />embankment ponds utilize separate principal and emergency spillways with the emergency <br />spillway located at a minimum of 1 foot above the elevation of the maximum water surface during <br />the discharge of the 10-year, 24-hour storm event through the principal spillway. The principal <br />spillways are designed for the 10-year, 24-hour storm event and the emergency spillways are <br />designed to pass the 25-year, 24-hour storm event in accordance with Rule 4.05.9(2)(c)(i). The <br />design requirements for existing ponds can be found on each of the pond as-built drawings or in <br />Volumes 2D and 2E Exhibit 7. All embankment sedimentation ponds will provide a non-clogging <br />dewatering device or conduit spillway to remove water storage from inflow. Design requirements <br />for all sediment ponds associate with the Collom Pit be found in Exhibit 7, Item 23. For <br />compliance purposes, in systems that incorporate ponds in a series, CDPS effluent quality <br />parameters will only apply to the last pond in the series that directly discharges into the receiving <br />stream or drainage. Out of pit designed ponds internal to the last pond in the series will be <br />inspected and maintained in the same manner as the “compliance” pond to ensure proper sediment <br />control and design performance. <br /> <br />The sumps along Haul Road A are required to have flow measurement devices at the outflow of <br />each sump. Each sump therefore will have a flume installed at the outflow to measure any flow <br />discharged from each sump. <br /> <br />It was deemed necessary to install a french drain structure to monitor the flows from the East <br />Taylor Spring. The East Taylor Spring is just above (south) of the East Taylor Pond. A clean <br />washed gravel filter was installed to route water to an underground-perforated pipe. The perforated <br />pipe then routes from the seep water to the surface to a parshall flume for flow measurements. At <br />the outlet of the parshall flume, the water is then routed through another twelve-inch solid pipe, <br />which is on the ground surface directly adjacent (west) to the Taylor Trib Ditch. The pipe ends at <br />the inlet of the East Taylor Pond were the spring water is discharged into the East Taylor Pond. <br />The location and a design for this french drain system is presented on Figure 4.05.7-1. <br /> <br />4.05.8 Acid-forming and Toxic-forming Spoil <br /> <br />Acid forming materials do not exist within the overburden to be removed by the mining operations. <br />A discussion on the overburden at the Colowyo operation has been conducted as set forth in <br />Section 2.04.6. A discussion of the overburden monitoring plan is set forth in Section 2.05. <br />
The URL can be used to link to this page
Your browser does not support the video tag.