Laserfiche WebLink
RULE 2 PERMITS <br /> ut k..*.m•7tst"sYr2tb o4 aa: 4ga5:.s va ra"Nkn+:.4&2b*.�.v '..c`*�-. :.�1u�44,00,de"+ - 'S is AAA A <br /> Unlike the sandstone above the coals to be mined on the property, the Trout Creek Sandstone is <br /> believed to contain water in storage because it occurs at an elevation beneath Goodspring Creek. <br /> However, limited data are available to describe the characteristics of the sandstone. Its recharge <br /> area is projected to be south of the mine property, or in an area where the Trout Creek Sandstone <br /> is above the elevation of Goodspring Creek and is exposed to the surface. Recharge is also <br /> expected to occur south of the mine property principally because annual precipitation increases at <br /> higher elevations. The direction of groundwater flow in the Trout Creek Sandstone is projected to <br /> be in a generally northeast direction following the general geologic structure. The principal <br /> discharge areas for the Trout Creek Sandstones are in the valleys of Goodspring and Taylor Creeks <br /> where the sandstones subcrop in the valley bottom. The Trout Creek Sandstone is removed by <br /> erosion in this general area. As a result, all groundwater in the sandstone is forced to the surface. <br /> Further evidence of the lack of groundwater above the coals currently being mined may be found <br /> by examining test hole data records collected while the property was being explored. <br /> Seventeen (17) observation wells were established to measure fluctuations in water levels at the <br /> Colowyo site prior to mining.Locations of these wells are shown on the Regional Hydrology Maps <br /> (Map 10B). Depth-to-water in these wells ranged from less than 20 feet to more than 500 feet as <br /> shown in Table 2.04.7-1, Well Logs and Water Level Measurements. Four (4) of the holes were <br /> augered to a depth of 25 feet by the USGS. Three of the test holes were completed in the <br /> floodplains of Goodspring, Taylor and Wilson Creeks. The fourth test hole was completed near <br /> the west of the ridge on the east side of the mine site. The Bureau of Reclamation drilled two (2) <br /> core test holes to a depth of 200 feet; these were completed as observation wells. W. R. Grace & <br /> Co. completed seven (7) exploration core holes as observation wells. In addition to these wells, <br /> the USGS drilled four(4)test holes in the valleys of Streeter and Taylor Creeks. These holes were <br /> drilled to depths of 60 to 100 feet and none produced more than 5 gallons per minute (gpm). <br /> Of the four 25 foot augered holes completed by the USGS, the water level in No. 3 on Taylor <br /> Creek declined below the bottom on the hole in the early fall when a tributary stopped flowing, <br /> and the others showed only small water level fluctuations. The rest of the holes in bedrock showed <br /> normal water level fluctuations. Examination of the water level data indicate that some bedrock <br /> wells in the stream valleys penetrate aquifers under pressure. The wells that had not been removed <br /> by mining and could still be located were remeasured by LRCWE in 1979. The water levels in <br /> these wells had not changed significantly. <br /> In four of the W. R. Grace & Co. core holes, Nos. 27, 33, 35 and 45, water at depths of less than <br /> 100 feet was cascading from perched aquifers. In Grace core holes Nos. 33 and 35 there was no <br /> accumulation of water to depths of 280 feet and 500 feet respectively.. Similarly, in Grace No. 27 <br /> water was cascading from a depth of about 80 feet, and measurements were stable only near the <br /> plugback depth of 295 feet. <br /> This and other well data indicate that groundwater is draining from the dissected upper part of the <br /> Williams Fork Formation and that there is not a single, continuous groundwater system on the <br /> property above the elevation of Goodspring Creek. Test drilling on the mine site revealed that the <br /> limited amounts of groundwater that exist on the site are usually perched on the highest <br /> iiiipeiiiieable bed. Continued upeiatiuii in the active pit during the permit term between 1981 and <br /> Rule 2 Permits 2.04-14 Revision Date: 12/20/19 <br /> Revision No.: TR-135 <br />