My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-24_REVISION - M2007006 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007006
>
2025-06-24_REVISION - M2007006 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 9:12:20 AM
Creation date
6/24/2025 12:35:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007006
IBM Index Class Name
Revision
Doc Date
6/24/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
PFM Consulting
Type & Sequence
SI2
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont’d Task # 002 Page 2 of 2 <br /> <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.800 (FND-RF) <br />Push gradient: 1.329 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.793 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.5196 <br /> <br />Adjusted unit production: 531.50 LCY/hr <br />Adjusted fleet production: 531.5 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.413/LCY <br /> <br />Total job time: 1.53 Hours <br />Total job cost: $337 <br />
The URL can be used to link to this page
Your browser does not support the video tag.