Laserfiche WebLink
Bulldozer Worksheet Cont’d Task # 001 Page 1 of 2 <br /> <br />BULLDOZER WORK <br /> <br />Task description: Grade slopes within east disturbance to 3H:1V Site: Ted Franciscotti Pit #1 Permit Action: TR2 Permit/Job#: M2007006 <br /> <br />PROJECT IDENTIFICATION Task #: 001 State: Colorado Abbreviation: None <br />Date: 5/28/2025 County: Huerfano Filename: 1 <br />User: AMG <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS XR Series II <br />Horsepower: 240 <br />Blade Type: Semi-Universal <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $90.24 NA <br />Operating Cost/Hour: $78.95 100 <br />Ripper own. Cost/Hour: $9.25 NA <br />Ripper op. Cost/Hour: $2.60 50 <br />Operator Cost/Hour: $38.59 NA <br />Total unit Cost/Hour: $219.63 <br />Total Fleet Cost/Hour: $219.63 <br /> <br />MATERIAL QUANTITIES Initial Volume: 902 <br />Swell factor: 1.060 <br />Loose volume: 956 LCY <br />Source of estimated volume: 2024 Inspection length est. ~ 1559’ L x 15’ H slope <br />2H:1V <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION Average push distance: 50 feet <br />Unadjusted hourly production: 1,022.9 LCY/hr <br /> <br />Materials consistency description: Consolidated stockpile 1.0 <br /> <br />Average push gradient: -15 % <br />Average site altitude: 6,100 feet <br /> <br />Material weight: 2,900 lbs/LCY <br /> <br />Weight description: Sand and gravel - Dry Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.100 (50% SL) <br />Visibility: 1.000 (AVG.)