My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-24_REVISION - M2007006 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007006
>
2025-06-24_REVISION - M2007006 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 9:12:20 AM
Creation date
6/24/2025 12:35:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007006
IBM Index Class Name
Revision
Doc Date
6/24/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
PFM Consulting
Type & Sequence
SI2
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> <br />CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> <br />Task description: Mobilization/Demobilization Site: Ted Franciscotti Pit #1 Permit Action: TR2 Permit/Job#: M2007006 <br /> <br />PROJECT IDENTIFICATION Task #: 006 State: Colorado Abbreviation: None <br />Date: 6/5/2025 County: Huerfano Filename: 6 <br />User: AMG Agency or organization name: DRMS <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: Available Rig Capacities 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership Cost/Hour: $10.44 $22.18 $23.94 <br />Operating Cost/Hour: $26.48 $54.55 $55.65 <br />Operator Cost/Hour: $22.52 $22.52 $22.52 <br />Helper Cost/Hour: $0.00 $23.53 $23.53 <br />Total Unit Cost/Hour: $59.44 $122.78 $125.64 <br /> <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Description <br />Weight/ <br />Unit <br />(TONS) <br />Owner ship <br />Cost/hr/ unit <br />Haul Rig <br />Cost/hr/uni <br />t <br />Fleet <br />Size <br />Haul Trip <br />Cost/hr/ <br />fleet <br />Return Trip Cost/hr/ fleet DOT Permit Cost/ fleet <br />Cat D7R DS XR <br />Series II <br />35.93 $99.49 $122.78 1 $222.27 $122.78 $250.00 <br />Drill/Broadcast <br />Seeder with <br />Tractor <br />25.00 $41.02 $59.44 2 $200.92 $118.88 $250.00 <br />Power Mulcher <br />(Bowie LD-90) <br />6.00 $27.21 $59.44 1 $86.65 $59.44 $250.00 <br />Cat 627G 41.80 $217.39 $122.78 1 $340.17 $122.78 $500.00 <br />Subtotals: $850.01 $423.88 $1,250.00 <br /> <br /> <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ <br />unit <br />Fleet Size Haul Trip <br />Cost/hr/ fleet <br />Return Trip Cost/hr/ fleet <br />Light Duty Pickup, 4x4, 3/4 T. $119.71 1 $119.71 $119.71 Subtotals: $119.71 $119.71 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.