My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-24_REVISION - M2007006 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007006
>
2025-06-24_REVISION - M2007006 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 9:12:20 AM
Creation date
6/24/2025 12:35:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007006
IBM Index Class Name
Revision
Doc Date
6/24/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
PFM Consulting
Type & Sequence
SI2
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont’d Task # 004 Page 1 of 2 <br /> <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br /> <br />Task description: Spread topsoil over 46 acres Site: Ted Franciscotti Pit #1 Permit Action: TR2 Permit/Job#: M2007006 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 004 State: Colorado Abbreviation: None <br />Date: 6/6/2025 County: Huerfano Filename: M006-004 <br />User: AMG <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br />-Scraper: Cat 627G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $217.39 NA NA NA NA NA <br />Operating cost/hour: $257.76 NA NA NA NA NA <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $30.90 NA NA NA NA NA <br />Unit Subtotals: $506.05 NA NA NA NA NA <br />Number of Units: 2 0 0 0 0 0 <br />Group Subtotals: Work: $1,012.10 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $1,012.10 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 37,107 CCY Swell factor: 1.215 <br />Loose volume: 45,085 LCY Source of estimated volume: 6” over 46 acres at any one time <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION Scraper Bowl (volume) Basis: Material weight: 1,600 lbs/LCY Struck Volume: 15.70 LCY <br />Material description: Top Soil Heaped Volume: 22.00 LCY <br />Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br />Payload Capacity: 33.00 LCY Adjusted Capacity: 18.85 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.