My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-23_REVISION - M1980244 (94)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-06-23_REVISION - M1980244 (94)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:43:38 AM
Creation date
6/24/2025 9:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/23/2025
Doc Name Note
Attachment 11
Doc Name
Adequacy Review Response
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newrnontr. CRIPPLE CREEK & VICTOR <br /> PO Box 191 <br /> CRIPPLE CREEK&VICTOR 10O Street <br /> Victtoror C CO 80860 <br /> • Monitor pro compatible tablet <br /> • Cooler with Ice <br /> • Sample Bottles <br /> • 0.45 Micron Filters <br /> • Sample Bucket <br /> • Water level meters (150ft and 500ft) <br /> • Portable (Geo-Sub or Redi-Flo) pump and controller <br /> • Generator <br /> • Appropriate keys for locks on the well head <br /> • Dedicated pump controller <br /> • Waterproof pen <br /> • Field sample log sheets <br /> Monitoring Well Sampling Procedure, Submersible Pump <br /> Prior to leaving for field identify the required parameters and analyses for planned <br /> sampling locations and collect equipment accordingly. <br /> 1. Upon arrival at the well location, perform field level risk assessment to <br /> determine location is safe to perform surface water sampling. Document risk <br /> assessment with field level risk assessment form. <br /> 2. With well location determined to be safe, complete a visual inspection of well <br /> vault/ monument, casing, site condition and if a dedicated pump is present <br /> 3. Measure the static water level in the well and record measurement listed as <br /> (depth to water). Water levels should be measured with a precision of+ 0.01 <br /> foot. <br /> 4. Decontaminate water level meter after use. <br /> 5. You may calculate the volume of water in the well to aid in the purging process, <br /> there is no required purge volume for the EPA low flow sampling standard, <br /> rather it is based on parameter stabilization. <br /> a. 2in = 617m1/ft <br /> b. 4 in = 2470 mI/ft <br /> 6. Insert decontaminated pump and tubing into the well descending slowly until <br /> pump is in the desired screened interval, avoid letting the pump come in <br /> contact with the well bottom. Ensure pump is lowered into the well slowly to <br /> avoid turbidity. <br /> 7. Attach the discharge tubing to the bottom port on the YSI water quality meter <br /> • flow cell. <br /> 8. Connect the pump to the controller with the cord provided <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT Doc Id: <br /> SIR Date of This Issue--/--/-- Date of Next Review:--/--/-- Page 56 of 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.