Laserfiche WebLink
Newmont CRIPPLE CREEK & VICTOR <br /> PO Box191 <br /> 100 N.CRIPPLE CREEK&VICTOR Victor <br /> 8086Street <br /> Victor CO 80860 <br /> 1. Introduction <br /> This Quality Assurance Project Plan (QAPP) describes the quality assurance and <br /> quality control (QA/QC) procedures and practices for Newmont's Cripple Creek <br /> and Victor Mine (CC&V). Included are Standard Operating Procedures(SOP)for the <br /> various stages of sample collection, shipping, and analyses. Sample schedules, <br /> location maps and analytical requirements are also included. This is a "living" <br /> document and is intended as guidance for site personnel; the QAPP is updated as <br /> needed to reflect changes to CC&V's water monitoring program and regulatory <br /> requirements. <br /> Accurate water quality data are critical to ensure permit compliance and <br /> demonstrate that water resources are not impacted by operations.The generation <br /> of reliable data begins with the collection of the sample. Adherence to the SOPs <br /> will ensure that samples are representative and collected in accordance with <br /> • standard water sampling methods. To produce data of defensible quality, this <br /> quality control program will be strictly adhered to during sample collection. <br /> The water-sampling program includes collecting samples, recording field data, <br /> submitting samples for analyses, reviewing, and recording analytical results. <br /> 1.1. Program Organization <br /> Duties of key program personnel are listed below: <br /> Table 1 Summary of Key Personnel <br /> Name Role Contact Info <br /> Katie Blake S&ER Manager Katie.Blake@Newmont.com <br /> (719) 689-4048 <br /> Antonio Matarrese Site Water Coordinator Antonio.Matarrese@Newmont.com <br /> (719) 851-4185 <br /> Paulina Barely Environmental Technician Paulina.Barela@Newmont.com <br /> (719) 851-4098 <br /> SVL Contract Laboratory Katie@svl,net <br /> (208) 784-1258 <br /> • <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT Doc Id: <br /> SER Date of This Issue--/--/-- Date of Next Review:--/--/-- Page 5 of 73 <br />