My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-23_REVISION - M1980244 (94)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-06-23_REVISION - M1980244 (94)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:43:38 AM
Creation date
6/24/2025 9:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/23/2025
Doc Name Note
Attachment 11
Doc Name
Adequacy Review Response
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmontm CRIPPLE CREEK & VICTOR <br /> PO Box 191 <br /> CRIPPLE CREEK&VICTOR 1ictorC 8086Street <br /> Victor CO 80860 <br /> Surface Water Sampling <br /> Prior to leaving for field identify the required parameters and analyses for planned <br /> sampling locations and collect equipment accordingly. <br /> Surface Water Sampling Equipment List <br /> • Field level risk assessment form (see section 4) <br /> • YSI Professional Multi Meter or Myron Ultrameter( pH, D.O., Specific conductance, <br /> Temperature) <br /> • Geo Peristaltic Pump <br /> • D.I. water <br /> • 100 ft. Tape measure <br /> • March McBirney 2000 portable Flow meter & Wadding Staff <br /> • Wader Boots <br /> • Monitor Pro compatible tablet <br /> • Cooler with ice <br /> • • Sample Bottles <br /> • 0.45 Micron Filters <br /> • Sampling vessel <br /> • Waterproof pen <br /> • Pre preserved sample bottles <br /> • Field sample log sheets <br /> Stream Flow Measurements <br /> Site inspection guidelines are as follows: <br /> 1. The channel should have as much straight run as possible. <br /> 2. Where the length of straight run is limited, the length upstream from the <br /> profile should be twice the downstream length. <br /> 3. The channel should be free of flow disturbances. <br /> 4. The flow should be free of swirls, eddies, vortices, backward flow, or dead <br /> zones. <br /> 5. Avoid areas immediately downstream from sharp bends or obstructions. <br /> 6. If flume or weir is in place, use flow measurement from the device, insure the <br /> devices have been calibrated prior to leaving for field. <br /> Marsh McBirney Flow Meter <br /> • Technical guidance can be found in the Instruction Manual for the model 2000 <br /> portable flow meter. <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT Doc Id: <br /> SI.R Date of This Issue--/--/-- Date of Next Review:--/--/-- Page 53 of 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.