My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-23_REVISION - M1980244 (94)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-06-23_REVISION - M1980244 (94)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:43:38 AM
Creation date
6/24/2025 9:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/23/2025
Doc Name Note
Attachment 11
Doc Name
Adequacy Review Response
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newrnont.. CRIPPLE CREEK & VICTOR <br /> PO Box191 <br /> 100 N.CRIPPLE CREEK&VICTOR Victor <br /> 8086Street <br /> Victor CO 80860 <br /> and the stabilized water level. Add the volume of the water which occupies the <br /> pump's tubing to this calculation. This combined volume of water needs to be <br /> purged from the well after the water level has stabilized before samples are <br /> collected. During purging monitor field parameters (pH, temperature, & <br /> conductivity). Purging is considered complete and sampling may begin when all <br /> the indicator field parameters (below) have stabilized. Achievement of turbidity <br /> levels of less than 5 NTU, and stable drawdowns of less than 0.3 feet, while <br /> desirable, are not mandatory. <br /> However, some wells yield such low volumes of water that this protocol cannot be <br /> followed. When sampling a low yield well evacuate the well to dryness once.Within <br /> 24 hours of this purge, collect, preserve, and handle the sample(s) according to <br /> normal procedures. <br /> Standard/Well-Volume Method may also be utilized for sampling monitoring wells, <br /> for this method three casing volumes will be evacuated prior to sampling. Measure <br /> • the stabilization criteria outlined below after each well volume is evacuated (i.e., if <br /> the well volume is 5 gallons, take measurements after evacuation of 5, 10, and 15 <br /> gallons). On the field form, record the volume of water evacuated, all stabilization <br /> parameters, and time that the measurements were made. After three well <br /> volumes have been purged (appendix E, well evacuation calculation) check the last <br /> two sets of measurements to determine if the field parameters have stabilized. If <br /> the field readings have not stabilized purge another well volume and take field <br /> measurements. Repeat until stabilized. <br /> Stabilization criteria are achieved when the following parameters are met over <br /> three consecutive readings. <br /> • Temperature - ±3%, <br /> • Specific Conductivity - ±3% <br /> • pH - ± 0.1 <br /> • Dissolved Oxygen - (10% for values greater than 0.5 mg/L, if three <br /> Dissolved Oxygen values are less than 0.5 mg/L, consider the values as <br /> stabilized) <br /> • Turbidity - (10% for values greater than 5 NTU; if three Turbidity values are <br /> • less than 5 NTU, consider the values as stabilized) <br /> • Oxidation/Reduction Potential - ±10 millivolts <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT Doc Id: <br /> SLIt Date of This Issue--/--/-- Date of Next Review:--/--/-- Page 24 of 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.