My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-23_REVISION - M1980244 (92)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-06-23_REVISION - M1980244 (92)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:43:37 AM
Creation date
6/24/2025 9:28:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/23/2025
Doc Name Note
Attachment 10
Doc Name
Adequacy Review Response
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mine ■ <br /> Valley Leach Facility Expansions ■ <br /> Detailed Design for Permitting <br /> NewFields Project No.475.0106.064 <br /> March 2024 <br /> Duncan, J.M., and Wright, S.G. (2005). Soil Strength and Slope Stability, John Wiley & Sons, Inc., <br /> Hoboken, New Jersey. <br /> Fang, H.Y. (1991). Foundation Engineering Handbook, Second Edition, Springer Science + <br /> Business Media, LLC., New York. <br /> Janbu, N. (1967). "Settlement Calculations Based on the Tangent Modulus Concept," Bulletin 2, <br /> Soil Mechanic and Foundation Engineering,The Technical University of Norway. <br /> Knight Piesold Consultants (2018). Cripple Creek and Victor Mine, Stormwater Management <br /> Evaluation—Review Findings, EMP 22 and ECOSA Facility Toe Berm Design Upgrades, Revision 4, <br /> October 8. <br /> Lee, A.Y., Shin, E.C., & Kim,J II. (2018). Applicability of the Equivalent Coefficient of Permeability <br /> in Geomembrane Lining Systems Having Defects. September 16-20. <br /> NewFields (2019). VLF2 Tailings Study Laboratory Testing & Stability Re-Evaluation. February 19. <br /> NewFields (2020). Valley Leach Facility 2 Phase 3 Detailed Design for Permitting, Revision 1. July. <br /> 411 NewFields (2023). Laboratory Tests for Ore Materials, draft. September. <br /> United States Society on Dams (USSD) (2011). "Materials for Embankment Dams".January. <br /> • <br /> Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.