Laserfiche WebLink
• SSR <br /> MINING <br /> Scenario Permit Criteria Reporting Additional <br /> Timeframe considerations <br /> percent of the total <br /> capacity of the PSSA <br /> in a sustained <br /> manner. <br /> Low Volume Solution The transducers After confirmation of Refer to section 3.3 <br /> Collection System monitoring data in the the initial monitoring of Exhibit G <br /> (LVSCS) LVSCS or the Leak results <br /> Detection Collection <br /> Recovery System <br /> exceed two <br /> feet in a sustained <br /> manner. <br /> Facilities identified as an EPF in the EPP are:AGVLF(lined area), VLF2(lined area), HG Mill Platform(lined area), <br /> ESP(lined area), ADR1 (lined area), external storage pond <br /> • "Comprehensive Environmental Response, Compensation,and Liability ACT(CERCLA): Reportable Quantities(RQ) <br /> In the event of a failure or imminent failure of a designated EPF, CC&V will provide notification to <br /> the Division within 24 hours. During business hours (8:00 am to 5:00 pm) notice shall be given to <br /> the Office. Outside of normal business hours, or if no one can be reached. Contact should be <br /> made to the Colorado Department of Local Affairs, Office of Emergency Management. Need to <br /> make the Office of Emergency Management aware that this is coordinated through DRMS and <br /> that they need to activate the Division's response network. <br /> The notification will include the following information; <br /> 1. Identify that this is a notification of an emergency condition <br /> 2. The nature of the condition including any chemicals and toxic or acid producing materials <br /> involved <br /> 3. An estimate of the quantity of any chemical, toxic or acid-forming material that has been <br /> or could be released <br /> 4. The time and duration of the occurrence and if it is on-going, or urgency of the pending <br /> situation <br /> • Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 14 <br /> 29 <br />