Laserfiche WebLink
• <br /> • SSR <br /> MINING <br /> 17 EMERGENCY RESPONSE PLAN (ERP) <br /> CC&V has developed an ERP for use by employees as a guide for the prevention, control, and <br /> reporting of releases of chemicals and hydrocarbon products at the Cresson Project and to <br /> respond to potential fires. The ERP is comprised of several documents including the Spill <br /> Prevention, Counter, and Countermeasures (SPCC) Plan, the Cyanide ERP, the Fire Protection <br /> Plan, the Geotechnical Code 90 Plan, and the Crisis Communication Plan. A copy of the ERP is <br /> provided in Appendix 12. The plan is based on the current operations at the Cresson Project and <br /> will be updated for expected future storage and use of chemicals, if any, for Amendment 14, once <br /> approved. <br /> 17.1 Events Requiring Reporting <br /> Scenario Permit Criteria Reporting Additional <br /> Timeframe considerations <br /> Release of process None specified Within 24 hours of None <br /> solution, containing the event <br /> • designated chemicals <br /> as identified in the <br /> EPP, outside of an <br /> EPF* <br /> Release of None specified Within 24 hours of None <br /> hydrocarbon product the event <br /> > 1000 gallons <br /> Release of any None specified Within 24 hours of None <br /> chemical >CERCLA the event <br /> RQ** <br /> Any other release None specified Within 24 hours of None <br /> required to be the event <br /> reported by other <br /> agencies <br /> Failure or imminent None specified Within 24 hours of None <br /> failure of the event <br /> impoundment, <br /> embankment, <br /> stockpile or slope <br /> that poses potential <br /> • Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 14 <br /> 27 <br />