Laserfiche WebLink
• <br /> • SSR <br /> MINING <br /> The geochemical evaluations also have included an analysis of the reasonable sources, probable <br /> fate, and transport mechanisms of metal and acid-producing minerals that may be mobilized <br /> during development and reclamation of the Cresson Project. Using the hydrologic and <br /> geochemical information developed for the District, an evaluation was conducted of the fate and <br /> transport of water infiltrating to the subsurface through mines, mine backfill, and overburden <br /> storage areas.The results of the analysis were verified by checking against the observed behavior <br /> of the hydraulics and chemistry of the diatreme since Cresson Project surface mining began in <br /> 1993, using the measured vertical hydraulic gradients in and near the diatreme, and the flow rate <br /> and chemistry of the regional groundwater exiting the Carlton Tunnel portal. <br /> • <br /> • Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 14 <br /> 18 <br />