Laserfiche WebLink
• <br /> SSR <br /> MINING <br /> TABLE OF CONTENTS <br /> 1 INTRODUCTION 1 <br /> 2 EVALUATION OF PROJECT COMPONENTS 2 <br /> 3 LOCATION FOR STORAGE OF DESIGNATED CHEMICALS 5 <br /> 4 ENVIRONMENTAL MEASURES REQUIRED BY OTHER AGENCIES 6 <br /> 4.1 Other Permits and Licenses 6 <br /> 5 DESIGNATED CHEMICALS MATERIALS EVALUATION 7 <br /> DESIGNATED CHEMICAL(S)AND MATERIAL(S) HANDLING 8 <br /> 6 FACILITIES EVALUATION 9 <br /> 7 GROUNDWATER INFORMATION 12 <br /> 7.1 Groundwater Quality Data 12 <br /> 1111 8 SURFACE WATER CONTROL AND CONTAINMENT INFORMATION 13 <br /> 8.1 Surface Water Quality Data 13 <br /> 9 WATER QUALITY MONITORING PLAN 14 <br /> 10 CLIMATE 15 <br /> 11 GEOCHEMICAL DATA AND ANALYSIS 16 <br /> 12 CONSTRUCTION SCHEDULE INFORMATION 18 <br /> 13 QUALITY ASSURANCE AND QUALITY CONTROL(QA/QC) 19 <br /> 14 PLANT GROWTH MEDIUM 23 <br /> 15 WILDLIFE PROTECTION 24 <br /> 16 DISPOSAL OF TAILINGS AND SLUDGES IN MINE WORKINGS 25 <br /> 17 EMERGENCY RESPONSE PLAN (ERP) 26 <br /> 17.1 Events Requiring Reporting 26 <br /> 18 REFERENCES 30 <br /> • Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 14 <br />