My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-23_REVISION - M1980244 (83)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-06-23_REVISION - M1980244 (83)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:43:37 AM
Creation date
6/24/2025 8:26:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/23/2025
Doc Name Note
Attachment 3 Exhibit E
Doc Name
Adequacy Review Response
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> SSR <br /> MINING <br /> typically is part of the fill materials that are pulled onto the road surface or will be retrieved if in <br /> close proximity to the road to assist with the reclamation effort. <br /> Roads outside the limits of the mine areas and OSAs will also be reclaimed. In consultation with <br /> appropriate representatives of Teller County, CC&V may later propose to retain and use certain <br /> existing road corridors to provide light-vehicle access to reclaimed areas for monitoring; however, <br /> it is not possible to specify those potential routes at the present time. <br /> 2.7.5 Ancillary Support Facilities <br /> Ancillary support facilities, including the crusher facilities and associated structures, the HG Mill <br /> facilities, both Adsorption, ADR facilities, the fire assay laboratory, the overland conveyor, the <br /> load out bin (LOB), the Ironclad facilities (maintenance-warehouse-office), and the associated <br /> utilities, monitoring systems, the Projects Offices facilities, fuel island, radio towers, associated <br /> tanks, pipelines and other structures and mobile equipment will be removed or reclaimed in the <br /> same manner as previously approved. The crusher facilities and associated structures, and the <br /> • Mill facilities will be decommissioned and removed prior to the construction activities described in <br /> Appendix 1. In consultation with appropriate representatives of Teller County, CC&V may later <br /> propose to retain and use some of the existing facilities; however, it is not possible to specify <br /> which of those existing facilities could remain at the present time. <br /> Once mining operations have ceased, portable equipment within the processing areas will be <br /> removed. Buildings and foundations either will be demolished and removed from the site or buried <br /> in place to a depth that will allow for reclamation procedures as discussed in Section 2. The areas <br /> of land disturbed by these activities will be regraded, covered with suitable growth medium, and <br /> reclaimed. <br /> Chemicals and reagents will be removed, along with empty containers, and disposed of <br /> appropriately at off-site facilities. <br /> Facilities will be dismantled and salvaged, as appropriate, after mining and processing operations <br /> are completed. Many of the materials in the facilities to be dismantled have salvage value; <br /> however, the computations for the financial warranty in Exhibit L do not assume credit for that <br /> salvage value. Following demolition and salvage, remaining debris for burial will be removed to <br /> an OSA, one of the mine areas backfill sites, or to the ESP footprint area, or will be buried in- <br /> • Cripple Creek&Victor Gold Mining Company Exhibit E <br /> Cresson Project Amendment 14 <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.