Laserfiche WebLink
• • <br /> SSR <br /> MINING <br /> TABLE OF CONTENTS <br /> 1 INTRODUCTION 1 <br /> 1.1 Objectives 1 <br /> 1.2 Summary of Amendment 14 Impacts to Reclamation 1 <br /> 2 RECLAMATION PROCEDURES 1 <br /> 2.1 Grading and Ripping 2 <br /> 2.2 Growth Medium Materials 2 <br /> 2.3 Growth Medium Replacement 3 <br /> 2.4 Revegetation 3 <br /> 2.5 Monitoring and Erosion Control 4 <br /> 2.6 General Reclamation 4 <br /> 2.7 Reclamation of the Mine Areas 5 <br /> 2.7.1 Overburden Storage Areas 9 <br /> 2.7.2 VLF1 and VLF2 13 <br /> 2.7.3 External Solution Storage Pond (ESP) 15 <br /> • 2.7.4 Haul Roads 15 <br /> 2.7.5 Ancillary Support Facilities 16 <br /> 2.7.6 Closure Stormwater 17 <br /> 3 RECLAMATION COSTS 17 <br /> 4 REFERENCES 18 <br /> • Cripple Creek&Victor Gold Mining Company Exhibit E <br /> Cresson Project Amendment 14 <br /> ii <br />