My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-23_REVISION - M1980244 (80)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-06-23_REVISION - M1980244 (80)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:43:37 AM
Creation date
6/24/2025 8:25:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/23/2025
Doc Name Note
Attachment 2 Exhibit D
Doc Name
Adequacy Review Response
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSR <br /> MINING <br /> Solution intercepted by the High-Volume Collection Pipes will feed directly into adsorption, <br /> desorption, and recovery (ADR) Plant 2 (ADR2). During periods of time of plant <br /> maintenance or a power outage, the solution coming from VLF2 Phase 4 will be directed <br /> into the VLF2 Phase 1 and Phase 2's Process Solution Storage Area (PSSA) by way of <br /> an infiltration gallery. <br /> • The expansion includes a fifth PSSA to the VLF1 facility. The Phase 6 PSSA is located <br /> within the existing crusher pocket and has an embankment east of the Phase 4 PSSA <br /> risers and a small containment embankment west of the Cresson Pit. The crusher and <br /> associated facilities will be decommissioned and removed prior to construction. <br /> • The expansion will include a composite liner system within the pad lined area and PSSA. <br /> The liner systems are identical to the liner systems previously deployed in VLF1 and VLF2. <br /> o Layers of the composite liner system within the PSSA from bottom up are: Soil <br /> Liner Fill (SLF), Secondary 100-mil linear low-density polyethylene (LLDPE) <br /> Geomembrane Liner, Low Volume Collection Fill, Primary 100-mil LLDPE <br /> Geomembrane Liner, and Drain Cover Fill (DCF). <br /> • o Layers of the composite liner system outside the PSSA footprint from the bottom <br /> up are: SLF, Primary 80-mil LLDPE Geomembrane Liner, and DCF. <br /> The VLF Expansion will be constructed in four Stages: VLF2 Phase 4 Stage A and B, and VLF1 <br /> Phase 6 Stage A and B. The staged construction will allow the mine to begin loading ore within <br /> the expansion area of the VLF prior to completion of the entire Phase. Prior to the construction of <br /> any stage, Issued for Construction (IFC) Drawings will be developed, and will consider changes <br /> in field conditions, mine production, climate impacts, contractor availability etc. It is anticipated <br /> that any changes to the design and staging of the VLF Expansion will be minor and will not require <br /> additional permitting. <br /> Amendment 14 is also proposing expansions to Globe Hill, Elkton, and East Cresson Pits. The <br /> projected mine sequencing for the Cresson Project is included in the discussions below, although <br /> it is important to note that the rate of mining as well as other timelines presented herein are <br /> approximate and depend on anticipated production rates, mining fleet, crusher availability, gold <br /> price, gold recovery, and other factors, such as fuel prices and weather conditions.As such, these <br /> approximate timelines may change and result in a shorter or a longer overall mine life. Details are <br /> provided on pre-mining activities of clearing and grubbing, mining operation development <br /> including drilling and blasting, mine area stability designs, underground development work, <br /> loading and hauling, crushing and conveying, and overburden handling. The following sections <br /> also describe the construction, surface water handling, stability of the Overburden Storage Areas <br /> • Cripple Creek&Victor Gold Mining Company Exhibit D <br /> Cresson Project Amendment 14 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.