My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-06-23_REVISION - M1980244 (80)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-06-23_REVISION - M1980244 (80)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:43:37 AM
Creation date
6/24/2025 8:25:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/23/2025
Doc Name Note
Attachment 2 Exhibit D
Doc Name
Adequacy Review Response
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Type & Sequence
AM14
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> SSR <br /> MINING <br /> 1 INTRODUCTION <br /> This updated mining plan presents the changes to the Cresson Project mining operations under <br /> this Amendment 14. The mining plan also provides the following: <br /> 1. a description of the affected lands boundary; <br /> 2. a description of the areas specifically affected by this Amendment 14, <br /> 3. the nature and sequence of mining activities including a generalized schedule and <br /> sequence for the proposed operations, and <br /> 4. a description of the facilities developed at the mine site. <br /> This mine plan was prepared in accordance with the Colorado Department of Reclamation Mining <br /> and Safety (DRMS) requirements; specifically, Rule 6.4.4 of the Mineral Rules and Regulations <br /> of the Colorado Mined Land Reclamation Board for Hard Rock, Metal, and Designated Mining <br /> Operations. <br /> 1.1 Overview of Amendment 14 Activities <br /> The Cripple Creek & Victor Gold Mining Company (CC&V) is proposing to expand the footprints <br /> • of three pits and both Valley Leach Facilities (VLFs) to accommodate additional ore reserves <br /> being identified within the mine area. The VLF1 and VLF2 Expansion design is consistent with <br /> the previously approved VLF designs that have been constructed, with some minor modifications <br /> that allow for the utilization of existing infrastructure. The Valley Leach Facility Expansions <br /> Detailed Design Report is provided in Appendix 1, and the characteristics of the proposed <br /> expansion are summarized below: <br /> • The expansion will push the VLF2 footprint south and east until it is adjacent to VLF1 <br /> Phase 4, adding 4.1 million square feet of lined area. The VLF1 footprint will expand to <br /> the north and east, adding 4.4 million square feet of lined area. The VLF1 and VLF2 <br /> expansions will add a total of 189 million tons of ore capacity to the existing facilities. <br /> • With the exception of Joe Dandy Hill, the majority of the expansion footprint sits within <br /> previously disturbed land; i.e., the footprint already has been cleared and grubbed of <br /> unsuitable materials, topsoil has been removed and stockpiled, and the underground <br /> workings have been removed or already remediated. <br /> • The expansion includes a fourth phase to the VLF2 Facility, which is proposed to be <br /> located within the existing High Grade Mill area, extending between the two existing VLFs. <br /> The Mill building and its supporting infrastructure will be decommissioned and removed <br /> prior to the VLF expansion activities. The proposed VLF2 expansion will be graded to drain <br /> towards the existing VLF with solution intercepted by High-Volume Collection Pipes. <br /> • Cripple Creek&Victor Gold Mining Company Exhibit D <br /> Cresson Project Amendment 14 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.