Laserfiche WebLink
• <br /> • SSR <br /> MINING <br /> TABLE OF CONTENTS <br /> 1 INTRODUCTION 1 <br /> 1.1 Overview of Amendment 14 Activities 1 <br /> 2 AFFECTED LANDS AND GEOLOGY 4 <br /> 2.1 Affected Lands 4 <br /> 2.2 Geology 4 <br /> 3 SEQUENCE OF DEVELOPMENT—SURFACE MINING OPERATIONS 6 <br /> 3.1 Clearing, Grubbing and Growth Medium Removal 9 <br /> 3.2 Mining Areas, Operations, and Equipment 11 <br /> 3.3 Surface Drilling and Blasting 12 <br /> 3.4 Mine Area Stability 12 <br /> 3.5 Loading, Hauling, and Selective Handling 14 <br /> 3.6 Sequence of Development—Underground Mining Areas 15 <br /> 3.7 Overburden Management 15 <br /> 3.8 Haul and Access Roads 16 <br /> 4 HIGH GRADE MILL FACILITIES 19 <br /> 4.1 Mill Reagents 19 <br /> • 4.2 Water Balance and Recycling 20 <br /> 4.3 Stormwater Control at the High-Grade Mill Facilities 20 <br /> 5 VALLEY LEACH FACILITIES 21 <br /> 5.1 VLF1 21 <br /> 5.2 VLF2 21 <br /> 5.3 VLF Water Balance 21 <br /> 5.4 Process Solution Enhancement System (PSES) 22 <br /> 6 PRECIOUS METALS RECOVERY FACILITY 23 <br /> 6.1 Chemical Usage at ADRs 23 <br /> 7 SUPPORT FACILITIES 24 <br /> 7.1 New or Upgraded Ancillary Buildings and Structures 24 <br /> 7.2 Power Supply 24 <br /> 7.3 Water Supply 24 <br /> 7.4 Security and Signs 25 <br /> 8 BLAST (SEISMIC) MONITORING 27 <br /> 9 REFERENCES 28 <br /> • Cripple Creek&Victor Gold Mining Company Exhibit D <br /> Cresson Project Amendment 14 <br />