Laserfiche WebLink
• <br /> SS R <br /> MINING <br /> Permit M-1980-244 <br /> Cresson Project Amendment 14 <br /> Preliminary Adequacy Review Response <br /> Table of Contents <br /> Exhibit C. Pre-Mining and Mining Plan Maps of Affected Lands: <br /> Drawing C-2. Existing and Approved Facilities <br /> Drawing C-2b. Existing Utilities <br /> Drawing C-3. Proposed Facilities Buildings and Utilities <br /> Attachment 2 Exhibit D. Mining Plan <br /> Attachment 3 Exhibit E. Reclamation Plan <br /> Attachment 4 Exhibit F. Reclamation Plan Maps <br /> Drawing F-1. Approximate Post Mining Topography <br /> Cresson Project <br /> Drawing F-2. North Cresson (Globe Hill) and East <br /> • Cresson (Wildhorse Extension) <br /> Drawing F-3. Chicago Tunnel/Poverty Gulch Detail <br /> Drawing F-4. Valley Leach Facility 2 <br /> Drawing F-5. East Cresson/Altman <br /> Drawing F-6. Main Cresson and South Cresson <br /> Drawing F-7. Valley Leach Facility 1 <br /> Drawing F-8. Main Cresson/Dump 1 <br /> Drawing F-9: Carlton Tunnel <br /> Attachment 5 Exhibit G. Water Information <br /> Drawing G-1. Groundwater Wells within 2 Miles of <br /> Affected Lands Boundary <br /> Drawing G-2. Surface Water Drainages and Spring <br /> Locations within 2 Miles of Affected Lands Boundary <br /> Attachment 6 Exhibit L. Reclamation Costs <br /> Attachment 7 Exhibit R. Proof of Filing with County Clerk and Recorder <br /> • Cripple Creek&Victor Gold Mining Company Table of Contents <br /> Cresson Project Amendment 14 Preliminary Adequacy Review <br /> 1 <br />