Laserfiche WebLink
AN EXAMPLE PUBLIC NOTICE WHICH MEETS THE REQUIREMENTS OF THE STATUTES IS SHOWN BELOW. <br /> THE BLANKS WHICH REQUIRE DATES WILL NEED TO BE FILLED IN ACCORDING TO THE FOLLOWING <br /> INSTRUCTIONS. PLEASE READ CAREFULLY. <br /> PUBLICATION INSTRUCTIONS: <br /> Date of commencement and date of completion should represent the dates which you feel most accurately describe the life of <br /> the operation. <br /> For all Regular(112)types of operations,this notice must be published once a week for four(4)consecutive weeks,starting <br /> within ten (10) days of the date the application is considered to be submitted to the Division. The final date for receiving <br /> comments is the 20th day after the fourth publication or the next regular business day. <br /> All notices must bepublished in a newspaper ofgeneral circulation in the localityof the proposed miningoperation and mailed <br /> p P p <br /> to the landowners as set forth in the Colorado Mined Land Reclamation Rules and Regulations. Since the date for <br /> consideration of your application may change,DO NOT include it in this notice. <br /> For a complete discussion of the notice procedures and objections,please refer to C.R.S. 34-32.5-112(10), 114 and 115. <br /> ***************************************************************************************************** <br /> ***** <br /> PUBLIC NOTICE <br /> (Operator Name) ; (Address and Phone Number) <br /> has filed an application for a Regular(112)Construction Materials Operation Reclamation Permit with the Colorado Mined <br /> Land Reclamation Board under provisions of the Colorado Land Reclamation Act for the Extraction of Construction Materials. <br /> The proposed mine is known as the(Name of the Mine) ,and is located at or <br /> near Section ,Township ,Range , Prime Meridian. <br /> The proposed date of commencement is , ,and the proposed date of completion <br /> is , . The proposed future use of the land is(Future Landuse) . Additional <br /> information and tentative decision date may be obtained from the Division of Reclamation,Mining,and Safety, 1313 Sherman <br /> Street, Room 215,Denver, Colorado 80203, (303) 866-3567,or at the(County Name) County Clerk and <br /> Recorder's office; (Clerk and Recorder's Address) ,or the above-named applicant. <br /> Comments must be in writing and must be received by the Division of Reclamation,Mining,and Safety by 4:00 p.m.on(Final <br /> Date for Comments) <br /> Please note that under the provisions of C.R.S. 34-32.5-101 et seq. Comments related to noise, truck traffic, hours of <br /> operation, visual impacts, effects on property values and other social or economic concerns are issues not subject to this <br /> Offce's jurisdiction. These subjects, and similar ones, are typically addressed by your local governments, rather than the <br /> Division of Reclamation, Mining, and Safety or the Mined Land Reclamation Board. <br /> M:\min\share\vsforms\07-07-01 vsforms\Construction 112.doc 07/24/2007) <br />