Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#003 Page 2 of 2 <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.697 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4702 <br /> Adjusted unit production: 514.26 LCY/hr <br /> Adjusted fleet production: 514.26 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.658/LCY <br /> Total job time: 3.57 Hours <br /> Total job cost: $1,208 <br />