My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-05_PERMIT FILE - C1981010 (23)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2025-05-05_PERMIT FILE - C1981010 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 9:58:10 AM
Creation date
6/12/2025 9:52:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
5/5/2025
Doc Name
pages 4-172 to 4-222z
Section_Exhibit Name
4.8 Hydrologic Impacts
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.8.1.4 Sediment Ponds <br /> <br />All runoff from disturbed areas at Trapper are routed through one or more sediment ponds. These ponds <br />are designed to control the sediment load in the water discharged from the Trapper permit area. <br /> <br />All future sediment ponds to be built at Trapper Mine are designed using hydrologic modeling techniques <br />to predict the peak settleable sediment load during the 10-year, 24-hour precipitation event. Detailed <br />design plans will be submitted to the Division at least 60 days prior to construction of the structures. <br />Existing ponds which were not designed using these techniques have been re-evaluated to ensure <br />adequacy of each sediment control system. The results of all hydrologic models are presented in <br />Appendix Q, Drainage and Sediment Control Plan. <br /> <br />Sediment load in surface water discharged from Trapper Mine is controlled by routing the water through a <br />series of one or more sediment ponds. Sediment ponds have been or will be built in all major drainages <br />at Trapper prior to topsoil removal for advancement of active pits. Sediment pond locations are shown on <br />Map M51, Drainage and Sediment Control. <br /> <br />As previously mentioned, all ponds have been designed or confirmed for adequacy, using hydrology and <br />sedimentology modeling. Trapper spent considerable time during the summer of 1986 in discussions with <br />the Division in order to determine the applicable curve numbers and sedimentology parameters for design <br />of drainage and sediment control systems. The agreed upon parameters are shown in Appendix Q, <br />Drainage and Sediment Control Plan, Section XII, Curve Number Determinations, and Section XIII, <br />Sedimentology Parameters. <br /> <br />The current drainage and sediment control plan calls for the use of up to 40 sediment ponds either singly <br />or in series over the 5-year permit term (2023-2027). Design information for each pond is summarized in <br />Table 4.8-6, Sediment Pond Summary Information. Details of all currently designed sediment ponds are <br />included in Appendix Q, Drainage and Sediment Control Plan. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />4-184
The URL can be used to link to this page
Your browser does not support the video tag.