My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-05_PERMIT FILE - C1981010 (23)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2025-05-05_PERMIT FILE - C1981010 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 9:58:10 AM
Creation date
6/12/2025 9:52:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
5/5/2025
Doc Name
pages 4-172 to 4-222z
Section_Exhibit Name
4.8 Hydrologic Impacts
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.8.1.2 Surface Drainage During Mining <br />The following section discusses diversions and culverts which will be used to control runoff during the <br />current permit term. Since submittal of our original permit document in 1980, Trapper has submitted <br />Technical Revision (TR -25) which altered design criteria for all future diversions and culverts. It has been <br />agreed -to by the CMLRD that Trapper will not be required to alter structures which were constructed prior <br />to the partial approval of TR -25 (Johnson and Pyeatt sediment control) September 5, 1986. <br />Haul Road Culvert Sizing <br />Haul road culvert sizes were determined using the 10 -year, 24-hour precipitation event predicting maxi- <br />mum flow rates. These maximum flow rates and sizes were predicted through hydrologic modeling tech- <br />niques. The results are presented in Table 4.8-2. Some haul road culverts are placed in undisturbed <br />drainages. Based on the Soil Conservation Service Curve Number Method for quantifying excess rainfall <br />or runoff volumes, the formula shows undisturbed drainages yield no runoff from the approved 10 -year, <br />24-hour precipitation event. In order to maintain proper drainage during high snowmelt or other <br />exceptional events, the culverts in undisturbed areas were sized at eighteen (18) inches diameter. <br />Table 4.8-2 presents the culvert sizing information for existing and future haul road culverts. Table 4.8-2a <br />lists most non -haul road and auxiliary culverts to identify and quantify culverts within the active mining and <br />reclamation area. Premine culverts installed outside of Trapper's active mining area are not shown in <br />permit tables or on the M51 maps. <br />The locations of all required culverts listed in both tables are shown on the Drainage and Sediment Con- <br />trol Map (M-51). Actual future culvert locations may vary from those shown on Map M51. If so, the pro- <br />cedures described in this section will be followed to ensure proper haul road culvert sizing and drainage <br />continuity. <br />Normal mining operations and weather conditions may require additional culvert installations within pit <br />areas (includes associated spoils) to provide environmentally sound access corridors across drainage <br />points or to divert runoff to existing drainageways. Culverts established within pit areas (often temporary <br />installations for a short period of time) will not be shown on Tables 4.8-2, 4.8-2a, or M51 map and will not <br />require Division approval prior to installation. Culverts established in these areas will be considered a <br />Best Technology Currently Available (BTCA) practice with the intent of minimizing erosional impacts to <br />Trapper's surface water hydrology. <br />4-173 <br />Revision: PP ` 07 <br />JAN 2 8 2014 approved: <br />
The URL can be used to link to this page
Your browser does not support the video tag.