Laserfiche WebLink
1.2.2 Permits and Licenses <br /> <br />Sections 1.2.2.1 and 1.2.2.2 present the permits and licenses required for coal mining and reclamation <br />operations for Trapper Mining Inc. and affiliate mines. <br /> <br /> <br />1.2.2.1 Trapper Mine <br /> <br />Field operations for Trapper Mine commenced in 1976. Trapper operated under a life of mine devel- <br />opment and extraction permit (No. 76-11A/C) approved by the Colorado Mined Land Reclamation Board <br />and an approved mine plan filed with the U.S. Geological Survey in 1976. In December 1982, the <br />Colorado Mined Land Reclamation Board approved a new mining and reclamation permit, C-1981-010, <br />for Trapper's operations. On April 29, 1983, the Assistant Secretary for Energy and Minerals approved <br />Trapper's mining and reclamation plan and the Federal Office of Surface Mining issued permit CO-0013 <br />authorizing Trapper's mining and reclamation activities on federal coal leases C-07518 and C-25948 for a <br />period of five years. On December 31, 1987, Trapper's permit to mine coal was renewed with the <br />Colorado Mined Land Reclamation Division through December 31, 1992. Subsequent five-year renewal <br />approvals of Trapper’s permit by the Colorado Division of Reclamation, Mining and Safety have occurred <br />since that time, most recently on January 1, 2018. Further details concerning required permits at Trapper <br />for air or water environmental protection are provided in Table 1.2-1. <br /> <br /> <br />1.2.2.2 Affiliate Coal Operations <br /> <br />Table 1.2-2 lists the permits required for mining and reclamation operations at the affiliate coal operations <br />and their status as of June, 2022. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 1-8