My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-27_PERMIT FILE - M2025026
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025026
>
2025-05-27_PERMIT FILE - M2025026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 8:19:26 AM
Creation date
6/2/2025 8:12:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025026
IBM Index Class Name
Permit File
Doc Date
5/27/2025
Doc Name
Application
From
Paul A. Hampton
To
DRMS
Email Name
DMC
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will consume<0.5 acre-feet of water per day for dust suppression and for use in the <br /> processing plant. Gold processing equipment is portable; however, the processing area <br /> will remain in the northeast corner of the site. An APEN will not be required as the site will <br /> not mine>70,000 tons of material peryearand is therefore exempt. Portable mining <br /> equipment such as loaders, trucks and excavators will be serviced on an as-needed basis <br /> onsite. Upon reclamation, all portable equipment will be removed from the site. A <br /> summary of equipment and related tanks that may exist on site at anygiven time is Listed <br /> below. <br /> - Overflow resource stockpiling-Tailings pond serving as a stormwater settling pond <br /> - 500-gallon diesel fuel tank in secondary containment(110%of tank capacity) <br /> - Off site camper(includes hygiene facilities) <br /> The following list is the best estimate of equipment that will be used onsite throughout the <br /> mine life: <br /> - 1 Front end loader <br /> - 2 Backhoes <br /> - 1 Dump truck <br /> - Portable gold-bearing gravel wash plant and gold processing equipment. <br /> All fuel tanks will have secondary containment.The current 500-gallon tank is within a <br /> steel cattle tank. Fuel tanks will be located in the processing area; see Map E-2. Several <br /> hazardous materials may be stored and used onsite throughoutthe project. These <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.