Laserfiche WebLink
EAST TAYLOR SEEPEAST TAYLOR POND12" PIPE ONGROUND SURFACEPOST MINE CHANNEL(CONSTRUCTED)PILOT PLANT (14'x16")BB'~5'VARIESNATIVE SOILSLOPE 2.00% TO 2.50%12" NON-PERFORATEDCORRUGATED HDPE PIPEPIPE CONTINUES FROMTHE FLUME TO THE POND12" PIPE (NON-PERFORATED)A' <br />A <br />PARSHALL FLUME:THROAT: 6"INLET/OUTLET: PIPE STUB1.0" CLEANGRAVEL FILLCLAYEY BACKFILL12" PERFORATEDCORRUGATED HDPEPIPESLOPE 2.00% TO 2.50%SAND RING FILTERAROUND GRAVELAA'~3'~5'VARIESNATIVE SOIL1" CLEAN WASHEDGRAVELFILTER FABRIC12" PERFORATED PIPESAND FILTER6" THICK (MIN)BB'A'GROUNDSURFACEPIPE CONTINUESTO POND ALONGEDGE OF CHANNELNATIVE MATERIALBACKFILLCLAYEYBACKFILLAA'APPROXIMATE SEEPEXCAVATION AREABB'NATIVE MATERIALBACKFILLCLAYEY BACKFILLSAND FILTER6" THICK (MIN)1" CLEAN WASHEDGRAVELMIN 10'MIN 5'PARSHALL FLUMEEXCAVATE AS DEEP ASSAFELY POSSIBLEFOLLOWING SEEPREVISIONNo.DATEBYCHKSCALE:As ShownDATE:7/21/20DRWG. BY:TONYAPPROVED BY:DRWG NO.East Taylor Spring French DrainFigure 4.05.7-1NSEWCONTOUR INTERVAL 25 FT.TOPO JUNE 2024AALEGENDPOST MINE CHANNELDISTURBANCE BOUNDARYColowyo Coal Company5731 State Highway 13Meeker, Colorado 81641100'0100'200'COALCOMPANYSAFETY-PEOPLE-PRODUCTION-ENERGYPage 29Scale 1" = 100'Scale 1" = 40'SURFACE PIPINGSEDIMENT PONDRECLAIMED AREASEXISTING ROADSMR-263Added pilot plant, revised map title5/6/25TonyTony