Laserfiche WebLink
Tmck/Loader Worksheet Cont'd Task#065 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 10560.00 11.50 5.00 16.50 690 15.314 <br /> Haul Time: 15.314 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 10560.00 -11.50 5.00 -6.50 2938 3.705 <br /> Return Time: 3.705 minutes <br /> Total Truck Cycle Time: 21.727 minutes <br /> Loading Tool unit <br /> Production 504.90 LCY/Hour Adjusted for job efficiency: 419.06 LCY/Hour <br /> Truck Unit Production <br /> 42.00 LCY/Hour Adjusted for job efficiency: 34.86 LCY/Hour <br /> Optimal No.of Trucks: 12 Truck(s) Selected Number of Trucks: 6 Truck(s) <br /> Adjusted hourly truck team production: 209.18 LCY/Hour <br /> Adjusted single truck/loader team production: 209.18 LCY/Hour <br /> Adjusted multiple truck/loader team production: 209.18 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 30.85 Hours <br /> Unit cost: $4.267 /LCY Total job cost: $27,536 <br /> CIRCES Cost Estimating Software <br />