My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-21_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2025-05-21_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2025 10:10:55 AM
Creation date
5/27/2025 10:08:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
5/21/2025
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
GCC Energy, LLC
Type & Sequence
MT9
Permit Index Doc Type
Findings
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDRAULIC EXCAVATOR WORK <br /> Task description: Clean sediment ponds(two cleanings) <br /> Site: King Coal Mine Permit Action: MT9 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 064 State: Colorado Abbreviation: None <br /> Date: 4/24/2025 County: La Plata Filename: C035-064 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat 312D L 9'-2" Stick Horsepower: 90 <br /> Attachment 1: ROPS Cab Weight(MT): 13.48 <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $49.68 NA <br /> Operating Cost/Hour: $28.87 100 <br /> Operator Cost/Hour: $33.87 NA <br /> Total Unit Cost/Hour: $112.42 <br /> Total Fleet Cost/Hour: $112.42 <br /> MATERIAL QUANTITIES <br /> Initial volume: 6,453 CCY Swell factor: 1.135 <br /> Loose volume: 7,324 LCY <br /> Source of estimated volume: 2 pond cleanings,2 ac ft per cleanout <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Excavator Cycle Time(load bucket,swing loaded,dump bucket,swing empyt ): <br /> Basic Job Condition Description: AVERAGE <br /> Secondary Job Condition within Basic Description: AVERAGE <br /> Cycle Time Value: 0.256 minutes <br /> Load Bucket Capacity <br /> Bucket Size Class: Medium <br /> Rated Capacity: 0.68 LCY(heaped) <br /> Bucket Fill Factor: 0.850 Hard,tough clay(80%-90%)0.850 <br /> Adjusted Capacity: 0.58 LCY <br /> Job Condition Correction Factors Site Altitude: 7500 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 135.47 LCY/Hour <br /> Adjusted Hourly Unit Production: 112.44 LCY/Hour <br /> Adjusted Hourly Fleet Production: 112.44 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Excavator Total job time: 65.14 Hours <br /> Unit cost: $1.000 /LCY Total job cost: $7,323 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.