Laserfiche WebLink
Tmck/Loader Worksheet Cont'd Task#017 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 200.00 0.00 5.00 5.00 2218 0.158 <br /> Haul Time: 0.158 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 200.00 0.00 5.00 5.00 2814 0.097 <br /> Return Time: 0.097 minutes <br /> Total Truck Cycle Time: 2.540 minutes <br /> Loading Tool unit <br /> Production 494.19 LCY/Hour Adjusted for job efficiency: 410.18 LCY/Hour <br /> Truck Unit Production <br /> 269.47 LCY/Hour Adjusted for job efficiency: 223.66 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 447.32 LCY/Hour <br /> Adjusted single truck/loader team production: 410.18 LCY/Hour <br /> Adjusted multiple truck/loader team production: 410.18 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 3.03 Hours <br /> Unit cost: $0.650 /LCY Total job cost: $809 <br /> CIRCES Cost Estimating Software <br />