Laserfiche WebLink
Tmck/Loader Worksheet Cont'd Task#015 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 3960.00 1.00 5.00 6.00 1855 2.181 <br /> 2 3960.00 -7.00 5.00 -2.00 2938 1.390 <br /> Haul Time: 3.571 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 3960.00 7.00 5.00 12.00 1440 2.756 <br /> 2 3960.00 -1.00 5.00 4.00 2849 1.401 <br /> Return Time: 4.157 minutes <br /> Total Truck Cycle Time: 10.093 minutes <br /> Loading Tool unit <br /> Production 467.20 LCY/Hour Adjusted for job efficiency: 387.78 LCY/Hour <br /> Truck Unit Production <br /> 67.81 LCY/Hour Adjusted for job efficiency: 56.29 LCY/Hour <br /> Optimal No.of Trucks: 7 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 112.57 LCY/Hour <br /> Adjusted single truck/loader team production: 112.57 LCY/Hour <br /> Adjusted multiple truck/loader team production: 112.57 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 152.37 Hours <br /> Unit cost: $2.367 /LCY Total job cost: $40,606 <br /> CIRCES Cost Estimating Software <br />