Laserfiche WebLink
Page 1 of 4 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: King I-Haul cover material to Waste Bank Expansion <br /> Site: King Coal Mine Permit Action: MT9 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 015 State: Colorado Abbreviation: None <br /> Date: 4/23/2025 County: La Plata Filename: C035-015 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 10-12 c ,6x4 <br /> -Loader: CAT 938H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support E ui ment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 NA NA NA NA <br /> Ownership cost/hour: $22.44 $32.87 NA NA NA NA <br /> Operating cost/hour: $60.44 $31.02 NA NA NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA NA NA <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $0.00 $36.85 NA NA NA NA <br /> Unit Subtotals: $82.88 $100.74 NA NA NA NA <br /> Number of Units: 2 1 0 0 0 0 <br /> Group Subtotals: Work: $266.50 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $266.50 <br /> MATERIAL QUANTITIES <br /> Initial volume: 14,723 CCY Swell factor: 1.165 <br /> Loose volume: 17,152 LCY <br /> Source of estimated volume: 2.6 acres x 6"depth <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,900 Pounds/LCY <br /> Description: Decomposed rock-50%Rock,50%Earth <br /> Rated Payload: 35,400 Pounds <br /> CIRCES Cost Estimating Software <br />