Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#308 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: King II-remove east and west cleanwater ditches <br /> Site: King Coal Mine Permit Action: MT9 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 308 State: Colorado Abbreviation: None <br /> Date: 4/24/2025 County: La Plata Filename: C035-308 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $173.32 NA <br /> Operating Cost/Hour: $109.71 100 <br /> Ripper own. $14.53 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $38.59 NA <br /> Total unit Cost/Hour: $336.15 <br /> Total Fleet Cost/Hour: $336.15 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 3,235 <br /> Swell factor: 1.330 <br /> Loose volume: 4,303 LCY <br /> Source of estimated volume: West:4x3x2480-East: lOx3xl920 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 1,400.0 LCY/hr <br /> production: <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push 5 % <br /> gradient: <br /> Average site altitude: 7,500 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br /> Job Condition Correction Factor Source <br />