Laserfiche WebLink
Tmck/Loader Worksheet Cont'd Task#303 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 490.00 3.00 5.00 8.00 1381 0.397 <br /> Haul Time: 0.397 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 490.00 -3.00 5.00 2.00 2905 0.204 <br /> Return Time: 0.204 minutes <br /> Total Truck Cycle Time: 3.309 minutes <br /> Loading Tool unit <br /> Production 504.90 LCY/Hour Adjusted for job efficiency: 419.06 LCY/Hour <br /> Truck Unit Production <br /> 275.83 LCY/Hour Adjusted for job efficiency: 228.94 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 457.89 LCY/Hour <br /> Adjusted single truck/loader team production: 419.06 LCY/Hour <br /> Adjusted multiple truck/loader team production: 419.06 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 50.64 Hours <br /> Unit cost: $1.031 /LCY Total job cost: $21,871 <br /> CIRCES Cost Estimating Software <br />