Laserfiche WebLink
Tmck/Loader Worksheet Cont'd Task#302 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1120.00 2.00 5.00 7.00 1568 0.747 <br /> Haul Time: 0.747 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1120.00 -2.00 5.00 3.00 2874 0.415 <br /> Return Time: 0.415 minutes <br /> Total Truck Cycle Time: 3.447 minutes <br /> Loading Tool unit <br /> Production 494.19 LCY/Hour Adjusted for job efficiency: 410.18 LCY/Hour <br /> Truck Unit Production <br /> 198.56 LCY/Hour Adjusted for job efficiency: 164.81 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 329.62 LCY/Hour <br /> Adjusted single truck/loader team production: 329.62 LCY/Hour <br /> Adjusted multiple truck/loader team production: 329.62 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 14.81 Hours <br /> Unit cost: $1.114 /LCY Total job cost: $5,437 <br /> CIRCES Cost Estimating Software <br />