Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Midterm Review 9 Reclamation Cost Summary <br /> Site: King Coal Mine Permit Action: MT9 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 4/21/2025 County: La Plata Filename: C035-000 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Demolish King I Structures DEMOLISH 1 50.00 $53,568 <br /> 002 Kin I-Rip 12"in aper facility area RIPPER 1 2.95 $1,016 <br /> 009 Kin I-reve etate hi hwall area Area#4 REVEGE 1 4.00 $2,324 <br /> 010 Kin I-rip and final grade lower facilities area GRADER 1 1.09 $172 <br /> 012 King I-regrade cover of pre-law portion of refuse DOZER 1 8.11 $2,725 <br /> area <br /> 013 King I-regrade 6"growth medium on Waste Bank DOZER 1 5.76 $1,937 <br /> Expansion <br /> 014 Kin I-reve etate Waste Bank Expansion REVEGE 1 5.00 $4,613 <br /> 015 King I-Haul cover material to Waste Bank TRUCKI 1 152.37 $40,606 <br /> Expansion <br /> 016 King I-regrade 3.5'of cover on Waste Bank DOZER 1 29.75 $10,000 <br /> Expansion <br /> 017 Kin I-Haul topsoil topost-law refuse area TRUCKI 1 3.03 $809 <br /> 018 Kin I-finish gradepost-law refuse area(area#6) GRADER 1 0.97 $152 <br /> 019 Kin I-reve etate refuse area(Area#6) REVEGE 1 2.00 $1,916 <br /> 020 Kin I-finish grade topsoil area GRADER 1 1.84 $286 <br /> 021 Kin I-reve etate borrow area REVEGE 1 4.00 $3,548 <br /> 022 Kin I- seal vent hole BOREHOLE 1 8.00 $1,829 <br /> 023 King I-backfill and regrade east and west DOZER 1 10.40 $3,495 <br /> sediment ponds <br /> 025 Kin I-reve etate east and west ponds(Area#6) REVEGE 1 4.00 $3,300 <br /> 032 King I-Rill and gully maint. 8 hours every other SITEMAINT 1 24.00 $5,672 <br /> r, 10 yrs ENANCE <br /> 050 King I&II-mobilize for initial reclamation MOBILIZE 1 8.00 $12,456 <br /> 051 King I&II-mobilize for rill and gully MOBILIZE 1 8.00 $5,079 <br /> maintenance,X 3 <br /> 052 King I&II-mobilize for second pond cleaning MOBILIZE 1 8.00 $2,451 <br /> 060 King II-Rill and gully maint. 8 hours every other SITEMAINT 1 24.00 $5,957 <br /> r, 10 yrs ENANCE <br /> 062 Weed Control over liability period REVEGE 1 35.00 $6,198 <br /> 064 Clean sediment ponds two cleanings) EXCAVATE 1 65.13 $7,323 <br /> 065 King II-haul sediment from ponds to King I site TRUCKI 1 30.85 $27,536 <br /> 100 Seal Mine Openings MINESEAL 1 32.00 $284,577 <br /> 12A King I-regrade 6"growth medium on Waste Bank DOZER 1 5.76 $1,937 <br /> Expansion <br /> 200 King II structural demolition DEMOLISH 1 140.00 $387,574 <br /> 300 King 11-Haul coal waste rock to Kin I waste pile I TRUCKI 1 1.06 $336 <br />