Laserfiche WebLink
-4- <br /> 14. Primary future(Post-mining)land use(check one): <br /> —f Cropland(CR) �� Pastureland(PL) ,�� General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> �. Residential(RS) Recreation(RC) L, Industrial/Commercial(IC) <br /> Developed Water Resources(WR) _ Solid Waste Disposal(WD) <br /> -- <br /> 15. Primary ent land use(check one): <br /> Ei <br /> Cropland(CR) El Pastureland(PL) General Agriculture(GA) <br /> _ <br /> Rangeland(RL) Forestry(FR) -ElWildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 16. Method of Mining: 111 Quarry(QR) Solution(SO) <br /> 16.1 Other: Briefly explain mining method(e.g.Placer,truck/shovel). <br /> Front loader and dozer excavating into haul trucks. <br /> 17. On Site Processing: Solution(SO) u Chemical(CH) 1-_ Thermal(TH) <br /> Heap Leach(HL) I Vat Leach(VL) <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No on-site processing_ <br /> Description of Amendment of Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s): <br /> N/A <br />