Laserfiche WebLink
Overburden will be placed on the west side, west of the mine. <br /> As each 10+/- acre plot is mined out, we will hegin to renlac_e <br /> overburden and topsoil to start the regeneration of plant material. . <br /> 1 ne resources of the local Natural Resources Conservation Service will <br /> be used for advice on need for soil tests, terracing, and seeding to insure <br /> success for our reclamation. Placing 3 to 4 inches of topsoil should give <br /> an ample root zone to start grass to growing. <br />