EXHIBIT D <br /> MINING PLAN <br /> 6.4.4 (e) All uppioxllllale timeline will put us iii ext.uvutioll mode <br /> in about 8 weeks after permit approval and removal of <br /> material in approximately l month after that period. This <br /> will be a long term mine. Any reclamation will likely take <br /> place in 5to10 years. The mine will be intermittent and <br /> orate 1ecc than I RC flay-c per year Material fre t this cite <br /> 1 , 1 J <br /> will be loaded by loader and hauled with trucks to <br /> county roads. <br /> (i)Topsoil removal should take 2-3 weeks; overburden <br /> removal, another 3 weeks. Material haulage is estimated <br /> at i Oto 20 years. Reclamation is estimated to take 2 <br /> years or two growing seasons, depending on weather <br /> conditions. <br /> (ii)The stages are planned to be in approx..10 acre <br /> increments. <br /> will start in the pact and wnrk r�iir 1,7 7 WPq Ds <br /> each stage is completed, overburden and topsoil will be <br /> replaced to begin the re-growth process. <br /> rig Ule eaNL Siuc ul we mining ope auon is conapicLcu, <br /> mining will move to the west. <br /> (f) <br /> (i) The topsoil ranges from 1-2 feet and 3to 4 ft <br /> of overburden. <br /> (ii) Another 10-18 ft. red clay base material then gravel. <br /> This material is located on a red clay bottom. <br />