Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob/Demob <br /> Varra-Coulson Resource Permit Action: <br /> Site: Project 2025Inspection Permit/Job#: M2013064 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 3/6/2025 County: Weld Filename: M064-005 <br /> User: NCG <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $10.44 $22.18 $23.94 <br /> Operating Cost/Hour: $26.48 $54.55 $55.65 <br /> Operator Cost/Hour: $22.52 $22.52 $22.52 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $59.44 $122.78 $125.64 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat D8T-8SU 53.08 $187.85 $125.64 1 $313.49 $125.64 $250.00 <br /> CAT 120M 15.53 $55.88 $59.44 1 $115.32 $59.44 $250.00 <br /> Cat 637G 57.28 $329.66 $125.64 2 $910.60 $251.28 $500.00 <br /> Subtotals: $1,339.41 $436.36 $1,000.00 <br /> ROADABLE EOUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Water Tanker,2,500 Gal. $34.10 1 $34.10 $34.10 <br /> Subtotals: $34.10 $34.10 <br /> CIRCES Cost Estimating Software <br />