My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-02_REVISION - C1981010 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2025-05-02_REVISION - C1981010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2025 11:15:36 AM
Creation date
5/6/2025 10:46:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
5/2/2025
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining, Inc.
Type & Sequence
PR12
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division requires each hole,well, or other underground opening be capped, sealed,backfilled or <br /> otherwise managed as per Rule 4.07.3. <br /> VI. Use of Explosives <br /> The blasting plan, as well as other items related to blasting,are discussed in permit Section 3.4,Vol. <br /> III. <br /> The Division approved blasting at times other than those described in the blasting schedule due to <br /> unavoidable hazardous situations. These situations include elimination of misfires, adverse weather, <br /> equipment failure,and safety related reasons (4. 08.3(2)(b)(v)and(4.08.4(2)). <br /> TMI proposed proposes removing a seismic monitoring unit as L-Pit continues to move away from <br /> the archeological site (5MF948) for the remainder of the mine life. Previously,TMI conducted a <br /> study of possible damage resulting from the use of explosives and proposed a monitoring/mitigation <br /> plan of archeological site 5MF948. In 2015 an Instantel Micromate Seismic Vibration monitoring <br /> unit was installed to provide monitoring at the site. To date,hundreds of seismic events have been <br /> recorded without exceeding the seismic threshold. Present operations in the L-Pit are now more than <br /> 2,400 feet from the site. TMI requested to cease seismic monitoring for this specific purpose with <br /> PR12. After analyzing TMI's data DRMS finds TMI's proposal to remove the seismic monitoring <br /> unit and end monitoring reasonable and approves of the reduction in monitoring. <br /> VII. Disposal of Excess Spoil <br /> Permit section 3. 5.3,Vol. III of the application discusses disposal of excess spoil. <br /> In accordance with TR106 and Appendix T,the K-Pit Buttress Fill is no longer required. The Horse <br /> Gulch Fill is described in Appendix T and inspected in accordance with Rule 4.09.1(11), and meets <br /> the definitions and regulations associated with valley fill and head of hollow construction. The <br /> Horse Gulch underdrain and runoff diversions were constructed in accordance with Rules 4.09.2(2), <br /> 4.09.3(1), and 4.09.2(7). The slope stability analysis for the Horse Gulch Fill demonstrates that the <br /> fill is designed to meet rules (4.09.1(7))and(4.09.2(1)). <br /> VIIL Coal Mine Waste Banks <br /> No specific approvals are granted to the applicant under this section. <br /> IX. Coal Mine Waste <br /> No specific approvals are granted to the applicant under this section. <br /> X. Backfilling and Grading <br /> Backfilling and grading are discussed under Section 3.5,Vol. III of the permit application. <br /> 1. The applicant is bonded for a maximum of four(4) spoil ridges at any time within each pit <br /> area. Reclamation has historically been, and is proposed for completion, at approximately <br /> the same rate as disturbance of any new ground(4.14.1). <br /> 2. Trapper committed to a minimum safety factor of 1.5 to ensure long term global stability in <br /> both the L and Ash Pits, exceeding the minimum requirements(4.12.2 and 4.27.3) <br /> 3. The Post Mine Topography Map (Map M12)is a permit requirement in permit section 3.5.3. <br /> 4. During PR9, TMI requested a variance for backfilling and grading portions of the L and Ash <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.