Laserfiche WebLink
ENERAL NOTES: <br />r 4 � �,,, � ! III 11� <br />l �, <br />f!( <br />37 <br />L <br />co <br />"� CACHE LA <br />uD Un-- UD UD 1 6r`���. �\ <br />I POUDRE RIVER <br />� <br />o» ` <br />e �y 1 I 1 RA2 <br />II11 k INDUSTRIAL/COMMERCIAL <br />483 INDU � <br />/ / r -/ <br />uD BACKFILL, GRADE, AND STABILIZE \ \ <br />RELOCATED <br />I �' I I � I I � I \ � � % BOXELDER <br />I l 1�� 1� � I I I I IDITCH <br />� PERMIT \ � <br />�I lll11t BOUNDARY 34 <br />LI 11111/r = 121.4 ACRES <br />II III I11111 � PERMIT AREA <br />EFFECTIVE <br />I` Ill Illiil I lilt FRENCH DRAIN \ , t 100 YEAR <br />DISCHARGE SWALE \ I I FLOODWAY <br />III : liIl11I I ` '� � I �"r I �� •� 1 1 , <br />1 ll ► � I <br />� l li i1111111 . \ I <br />j <br />EFFECTIVE <br />l Ill II I I I I111111� \ \ I 1 1 1 <br />l�oYEAR <br />� 11 I I I I I 1111 11 I/ <br />M F00DPAIN <br />APPROXIMATE CLAY \ <br />! G� LINER LOCATION 1 �' <br />I� lII.111111 � l l I \ \ ! •� � � � <br />I III 11111I1 r I1111 SCREENING BERM 1 <br />I III ' 111� 111 i II ll 11 l l 1 � �►� .,� � 1 - <br />I IiII1111411111111I11I1 ,.- ..,,`- <br />I 11 1 4 1 11 II II .► ♦ / � \ I � 1 1 <br />I 11111111 I 11 I I l i `' 20 �` ! `.. <br />I 1111 I11I11 III) II ♦ % 14' UTILITY �+ ti✓ I <br />II:1ll I IIII I ♦ �/ EASEMENT I <br />♦ <br />1 I1 1 Ill I I l I I .� <br />j I I I 11 l 11 I I I I III <br />I <br />Q <br />1111111 I f 1 III �` <br />ill 11 II I111 l I ♦ '�/ <br />I II : I Illlll I I III11 l I ♦♦ �.� \ `° <br />li 11I III111111 111111I ♦ �'/ ` <br />,� II iI: III�IIi II IiIIIII ♦ fit' <br />N 11 iJl I I ♦ 14' UTILITY <br />I III III111 11111111 ! ♦ EASEMENT3H:1V RECLAIMED <br />l 111 �Illli fl�Illll l SLOPE/ RESERVOIR LINER f ♦ ``------ - - ------ li <br />I il: Illl I l 11111I ♦ 1 <br />li 11111 �11�I1 i l l <br />Ii i l 1111 � I l ♦ ! <br />I II: IIIIII Ii�i1111 ♦♦ <br />I� 14l IIII111111,111 ♦ I <br />R 11. 1111111I Il�lll <br />11111111111 IIi p1 ♦ I <br />Jill Ij IIII 11�111 �♦ - <br />I ll•111111111I11 ♦ 33 l� <br />I i 1141111I I1 I II Illl�i � ; �. <br />I 11 • III11 llal��ll1 ♦♦ i <br />APPROXIMATE CLAY RA <br />LINER LOCATION ERVIOR' BACKFILL, GRADE, AND STABILIZE - <br />BELOW -GRADE RES �` l <br />I II .I1111 �4\� DEVELOPED WATER RESOURCES o� <br />I I I I II11 ,Nam-- _ <br />lilt <br />� I I •III 11 � 1 <b ..��.�..____ � ♦ � <br />.II 1 <br />i RA4 <br />1 -.`�`'�►'-��� .,�: i INDUSTRIAL/COMMERCIAL <br />. s... <br />�' ` ®•,,, `•,''��, �\ i►,'�,,,��°R. 3H:1V RESERVOIR I I <br />q83 ��►e``.�\\i'\ � \ LINER <br />+ EFFECTIVE \ d."� _ _ .� _ <br />�1 100 YEAR <br />``'��`°\tj�e__-`.-_..f��__ -__- �2=- -_'- _ -- � •yr -. -s•- .=- =ram �- �- �r,�- �r �- �r - ��~~_ ► <br />FLOODPLAIN ".._ - ~ - � ._. ••_ - � _ <br />! �. �'+. �� �� .�-���'�d„�-1!�'��I_.T _ _ ��-� r.. ,..•,,, �+ -`•tee I- -` "` ,� \ I <br />A <br />ET!-* <br />111 ti , RECHARGE POND • - ` ~S , �% ,rEF-FP 2 _ EF-FP" "" _` -ET.-F - -' - EF-FP <br />TOP OF LEVEE 4834' \ ! � �•� <br />18" CULVERT RECHARGE POND m <br />&GATE <br />7-- OWN <br />4 <br />. xlow <br />_ <br />Milli <br />_._, ._... _. ... ..._Jl. <br />v.,. <br />" COUNTY ROAD 36.X <br />-�3 r-, d�_�� PERMIT `` ! EXISTING 36" CMP <br />- { �` �I d3-�3 BOUNDARY j <br />RECHARGE POND OUTLET -- <br />---fig. _ TO EXISTING CULVERT Pt <br />IEF Fw `EF"FP -'' ..- I .� r'�- -�`� o, j \�'? - `,,� <br />F� RECHARGE POND OUTLET �r-FW L <br />EFFECTIVE 'cdy TO EXISTING DRAIN F 1 III 1 <br />EF-F <br />I 100 YEAR - FF�E.:' l� W <br />FLOODWAYo5 ,11 ,%`,fl <br />'rll <br />0 150 <br />300 <br />(IN FEET) <br />1 INCH = 150 FEET <br />LEGEND: <br />PROPOSED MAJOR CONTOUR -- <br />--- 4820------ <br />PROPOSED MINOR CONTOUR <br />EXISTING CONTOUR - <br />- - -5013- - -- -" <br />EXISTING RIGHT OF WAY <br />PERMIT BOUNDARY <br />SURFACE WATER <br />---- <br />EFFECTIVE 100 YEAR FLOODWAY <br />EF-FW <br />EFFECTIVE 100 YEAR FLOODPLAIN <br />EF-FP <br />FRENCH DRAIN <br />UD_ <br />PAVED ROAD AREA <br />ERVIOR LINER NOTE <br />1. PRIOR TO CONSTRUCTION, OVERBURDEN AND CLAYSTONE MATERIAL TESTING <br />SHALL BE PERFORMED FOR USE IN FINAL DESIGN. THE FOLLOWING SPECIFICATIONS <br />AND PROCEDURES ARE PROVIDED AS A GENERAL GUIDELINE FOR PERMITTING <br />PURPOSES. FINAL SPECIFICATIONS AND DESIGN CRITERIA WILL BE DEVELOPED <br />DURING THE FINAL DESIGN PROCESS. <br />2. EACH LAYER OF FILL SHALL BE SCARIFIED TO ALLOW PROPER BONDING BETWEEN <br />LAYERS. <br />3. DENSITY AND MOISTURE CONTENT TESTING SHALL BE PERFORMED AT A RATE OF 1 <br />(ONE) TEST FOR EACH 2,000 YARDS PLACED. <br />4. ALL CLAY LINER MATERIAL SHALL BE COMPACTED TO A MINIMUM 95% ASTM-D698-78 <br />STANDARD PROCTOR AT +2% OF OPTIMUM MOISTURE CONTENT. <br />5. NO LINER MATERIAL SHALL BE PLACED IN THE LINER SLOPE WHILE EITHER THE <br />MATERIAL, EMBANKMENT, OR FOUNDATION IS FROZEN AND NO ORGANIC MATERIAL <br />SHALL BE PLACED IN THE LINER SLOPE. <br />6. EACH LAYER OR LIFT SHALL BE CONSTRUCTED CONTINUOUSLY AND <br />APPROXIMATELY HORIZONTAL FOR THE WIDTH AND LENGTH OF EACH LIFT. <br />7. LINER MATERIAL SHALL BE COMPOSED OF CLAYEY OVERBURDEN AND WEATHERED <br />CLAYSTONE THAT BREAKS DOWN DURING PROCESSING, BEDROCK MATERIAL SHALL <br />BE RIPPED, MOISTURE TREATED, AND ALLOWED TO AIR SLAKE FOR A MINIMUM OF <br />ONE DAY PRIOR TO ITS PLACEMENT IN THE LINER. ALL BEDROCK MATERIAL SHALL <br />HAVE A MINIMUM OF 75% PASS THE US STANDARD 200 SIEVE PRIOR TO PLACEMENT <br />IN THE EMBANKMENT. <br />8. THE CLAY LINER MATERIAL SHALL BE MIXED IN THE EMBANKMENT AT THE RATIO OF <br />4 (FOUR) PARTS CLAY OVERBURDEN TO 1 (ONE) PART SHALE BEDROCK MATERIAL. <br />9. LINER MATERIAL SHALL BE PLACED IN A 9-INCH (MAXIMUM) LOOSE LIFT PRIOR TO <br />COMPACTION. <br />10. A CATERPILLAR 815 OR 825 SHEEPSFOOT COMPACTOR (OR EQUIVALENT) SHALL BE <br />USED FOR COMPACTING EFFORTS. <br />i l . THE COMPLETED LINER SHALL BE PROTECTED FROM DAMAGE CAUSED BY <br />DESICCATION OR FREEZING TEMPERATURES BY PLACING RANDOM FILL OR A <br />MINIMUM OF 12-INCHES PIT RUN MATERIAL ON THE ENTIRE SLOPE. ALL RANDOM FILL <br />TO BE PLACED WITH A MAXIMUM 9-INCH LOOSE LIFT AND COMPACTED TO A <br />MINIMUM OF 95% ASTM-D698-78 STANDARD PROCTOR. <br />1.2. ALL WEATHERED BEDROCK TO BE EXCAVATED AND REMOVED FROM THE CLAY <br />LINER FOUNDATION. WEATHERED BEDROCK SHALL BE REMOVED UNTIL COMPETENT <br />BEDROCK (AS DETERMINED BY THE ONSITE ENGINEER) IS EXPOSED. THE BEDROCK <br />SHALL THEN BE SCARIFIED PRIOR TO THE PLACEMENT OF FILL MATERIAL. <br />FLOODWAY DIVERSION BERM NOTE <br />1. BERM LOCATION AND ALIGNMENT MAY BE SHIFTED NORTH AS NEEDED WITHOUT <br />FLOODWAY IMPACT. <br />2. BERM ELEVATION MAY BE HIGHER THAN INDICATED IF EXTRA OVERBURDEN <br />MATERIALS ARE AVAILABLE. <br />3. BERM WIDTH MAY BE WIDER THAN INDICATED WITHOUT FLOODWAY IMPACT IF <br />ELEVATION IS NOT ABOVE EXISTING GROUND ELEVATION TO THE SOUTH. <br />EXISTING <br />GRADE <br />RECHARGE POND <br />3 <br />5.0' (MIN.) <br />10. o <br />FLOODWAY DIVERSION BE <br />W <br />1. THIS TIMNATH CONNELL PIT AMENDMENT PROPOSES TO CHANGE THE RECLAMATION <br />PLAN TO INCLUDE OPPORTUNITIES FOR FUTURE DEVELOPMENT CONSISTENT WITH <br />THE ESTABLISHED TIMNATH ZONING DISTRICT AND THE PROPERTY OWNER <br />PREFERENCES. THE AMENDMENT APPLICATION FORM INCLUDES A COMBINATION OF <br />DEVELOPED WATER RESOURCES, INDUSTRIAL/COMMERCIAL, AND RESIDENTIAL <br />POST -MINING LAND USES. FINAL RECLAMATION PROPOSES CREATION OF STABLE <br />LANDFORMS TO SUPPORT THE ZONING DISTRICT ALLOWABLE LAND USES. THIS <br />COMBINATION OF MINED LAND RECLAMATION BOARD (MLRB) FINAL LAND USES <br />WILL ALLOW FUTURE DEVELOPMENT OF THE PROPERTY CONSISTENT WITH THE <br />CURRENT TOWN OF TIMNATH ZONING DISTRICT, REGIONAL COMMERCIAL (RC). THE <br />REGIONAL COMMERCIAL ZONING DISTRICT INCLUDES REGIONAL COMMERCIAL USES <br />SUCH AS LARGE RETAIL ESTABLISHMENTS, BUSINESS AND LIGHT INDUSTRIAL USES, <br />MEDICAL FACILITIES AND OFFICES, HIGHER DENSITY MULTI -FAMILY RESIDENTIAL, <br />AND A CONTINUUM OF LIFE -CARE HOUSING OPTIONS. <br />2. PHASE I MINING IS COMPLETE, THE PHASE 1 MINING AREA IS TO BE RECLAIMED WITH <br />A COMBINATION OF BELOW -GRADE LINED RESERVOIR, RECHARGE PONDS, AND <br />COMPACTED BACKFILL. THE RESERVOIR LINER CONSTRUCTION HAS BEEN <br />COMPLETED ON THE WEST AND SOUTH SIDES OF THE MINING AREA. <br />3. PHASE 2 MINING IS COMPLETE. THE PHASE 2 MINING AREA HAS BEEN BACKFILLED, <br />COMPACTED, GRADED, AND SEEDED FOR REVEGETATION. SEEDING WAS <br />ACCOMPLISHED WITH THE PREVIOUSLY APPROVED RECLAMATION SEED MIX. THE <br />WEITZEL ROAD EXTENSION HAS BEEN CONSTRUCTED AND THE ROAD AND <br />RIGHT-OF-WAY HAVE BEEN RELEASED FROM THE PERMIT AREA. THE RELOCATED <br />BOX ELDER DITCH HAS ALSO BEEN CONSTRUCTED IN THE PHASE 2 MINING AREA. <br />4. RECLAMATION WILL GENERALLY INCLUDE BACKFILLING, COMPACTING, GRADING, <br />AND STABILIZATION OF AREAS PLANNED FOR FURTHER DEVELOPMENT FOLLOWING <br />RELEASE FROM THE MLRB RECLAMATION PERMIT. MANY OF THE MINING AREAS <br />HAVE BEEN, OR WILL BE, BACKFILLED TO ACCOMMODATE FUTURE <br />INDUSTRIAL/COMMERCIAL OR RESIDENTIAL DEVELOPMENT BY PLACING <br />STRUCTURAL OR OTHER APPROPRIATE FILL MATERIAL, COMPACTING FOR FUTURE <br />STABILITY, AND GRADING FOR DEVELOPMENT NEEDS SUCH AS STORMWATER SEWER <br />DESIGN AND CONSTRUCTION. <br />5. AREAS OF PHASE 1 AND PHASE 2 THAT HAVE ALREADY BEEN BACKFILLED, <br />COMPACTED, TOPSOILED, GRADED, AND SEEDED HAVE BEEN PLANTED WITH THE <br />PREVIOUSLY APPROVED GRASS SEED MIX BELOW. <br />Timnath Connell Pit Approved <br />Revegetation Seed Mix <br />Rate <br />Grass Species (lbs PLS/acre) <br />eatgrass, <br />Thinspike <br />5.5 <br />Grama, Sideoats <br />2.5 <br />Switchgrass <br />1.5 <br />TOTAL <br />9.5 <br />Rates are for drill seeding. If broadcast <br />seeding is used, double seeding rates. <br />6. ALL AVAILABLE TOPSOIL AND OVERBURDEN MATERIAL WILL BE USED FOR <br />RECLAMATION. <br />7. SOME AREAS DISTURBED BY MINING ACTIVITIES WILL BE PREPARED WITH TOPSOIL <br />AND REVEGETATED DURING RECLAMATION. ALTERNATIVELY, AREAS PLANNED FOR <br />MORE IMMEDIATE MLRB PERMIT RELEASE AND DEVELOPMENT MAY BE BACKFILLED, <br />COMPACTED, AND COVERED WITH SUITABLE SOIL STABILIZING MATERIAL SUCH AS <br />HYDRO -MULCH, SOIL TACKIFIER, OR A LAYER OF ROCK TO MEET PERMIT RELEASE <br />REQUIREMENTS. <br />8. IF REVEGETATION OCCURS, IT WILL GENERATE A BLEND OF FAST GROWING, <br />STABILIZING, GRASS SPECIES AND, GIVEN SUITABLE PRECIPITATION, SHOULD <br />PRODUCE GOOD VEGETATION COVER OVER MUCH OF THE REVEGETATED AREA. <br />ALTHOUGH MINE PITS WILL BE BACKFILLED, COMPACTED, AND GRADED TO BLEND <br />INTO THE ADJACENT TOPOGRAPHY AND PROVIDE FUTURE DEVELOPMENT NEEDS, NO <br />SLOPES WILL BE RECLAIMED ANY STEEPER THAN 3H:1 V. <br />8. THE NEW PROPOSED FAST GROWING, STABILIZING SEED MIXTURE FOR FUTURE <br />REVEGETATION IS PROVIDED BELOW. <br />SEC <br />Timnath Connell Pit Amendment <br />Proposed Revegetation Seed Mix <br />Rate <br />Grass Species (lbs PLS/acre) <br />Intermediate <br />Wheatgrass <br />5 <br />Blue Grama <br />1 <br />Triticale <br />1 1.25 <br />TOTAL <br />7.25 <br />Rates are for broadcast seeding. <br />9. PERIODIC INSPECTION FOR NOXIOUS WEEDS, AT LEAST ONCE A YEAR EARLY IN THE <br />SEASON, WILL BE DONE AS PART OF A WEED MANAGEMENT PLAN. <br />10. BEST MANAGEMENT PRACTICES WILL BE USED TO CONTROL EROSION AND <br />STORMWATER SUSPENDED SEDIMENT RUNOFF FROM THE SITE DURING <br />RECLAMATION ACTIVITIES. <br />15' <br />RANDOM FILL <br />\-C6MPACTED \ \ - �. 0.5/1 <br />LINER <br />5.0 (MIN.) <br />10.0' <br />RESERVOIR LINER <br />MINE PIT REcOVED <br />FUTURE BELOW -GRAD RESERVOIR <br />MAY 0 5 2025 <br />Colorado Division of Redamdon, <br />Mining and SafetY <br />M � tt) <br />N O N N N N N <br />((D O <br />o 0 0 0 <br />mu)Y Y Y Y Y <br />W <br />W <br />O_ <br />< <br />Q <br />•> <br />N <br />CU <br />It- <br />W <br />W <br />Z <br />z <br />Z <br />t j <br />W <br />cr <br />0 <br />0 <br />0 <br />Q <br />cl� <br />(n <br />E5 <br />U) <br />W <br />W <br />W <br />W <br />W <br />w <br />W <br />J <br />J <br />J <br />0 <br />Z <br />U <br /><C <br /><t <br />¢ <br />Q <br />w <br />Q <br />Z <br />Z <br />Z <br />0 <br />0 <br />0 <br />2 <br />2 <br />2 <br />I- <br />Z <br />F-- <br />w <br />w <br />w <br />z <br />L.rt� <br />W <br />z <br />z <br />0 <br />U <br />F-- <br />Q <br />C <br />♦- <br />D <br />n <br />U <br />z <br />W 0 <br />W a <br />�.L.. <br />D O <br />0 <br />(n z <br />W o <br />ry U <br />J W <br />W <br />z <br />z <br />0 <br />U <br />Q <br />z <br />LL <br />H <br />z <br />=0 <br />XQ <br />W <br />� <br />Q <br />J <br />U <br />W <br />ry <br />PERMIT <br />BOUNDARY Date: APRIL 2025 <br />Job No: 590-004 <br />Drawn: M. MOKVYTS <br />FRENCH Desi n: M. MOKVYTS <br />DRAIN 6.0 - 8.0Checked: B. SCHENDERLEIN <br />o Scale: 1" = 157 <br />UNDISTURBED Sheet' <br />SAND & GRAVEL <br />GROUNDWATER COLLECTION TRENCH NOT TO SCALE <br />Of: <br />