Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Topsoil depth across the project area is approximately 6 to 12 inches, though this may <br /> vary depending on localized site conditions, slope position, and vegetation type. <br /> Topsoil will be mechanically stripped, all efforts will be made to avoid compaction and <br /> loss of soil structure during this phase. <br /> outside of active disturbance zones. <br /> Topsoil will be redistributed evenly across regraded areas. <br /> Following topsoil placement. the area will be seeded with an approved native seed mix. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> All drill holes will be plugged in accordance with Rule 5.4.2 along with State & County <br /> regulations. If ground water is encountered, the hole will be plugged pursuant to Rule <br /> 5.4.2 (2). <br /> Generally holes will be plugged with cement usually to the length of casing. <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed(refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Drill pad will be returned to original contour and salvaged topsoil will be relocated to <br /> disturbed area.. <br /> Form 2—Public File Page 9 of 14 <br />