My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-05_PERMIT FILE - P2025003 (2)
>
Day Forward
>
Permit File
>
Prospect
>
P2025003
>
2025-05-05_PERMIT FILE - P2025003 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2025 9:56:21 AM
Creation date
5/6/2025 9:48:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2025003
IBM Index Class Name
Permit File
Doc Date
5/5/2025
Doc Name
Incompleteness Response
From
Fermi Metals LLC
To
DRMS
Email Name
JR2
AME
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Other Disturbances (please describe) <br /> No other disturbances <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Drilling fluids are used at the discretion of the driller and may include Haliburton Casing Seal,Soda Ash,Quik-Gel, <br /> Quik-Fnam and EZ-Mud The first page of the MSDA sheets is attached Allfluids are not designated as ha7ardnus waste <br /> by the EPA. <br /> Hazardous substances utilized at the Project will include diesel fuel,gasoline,and lubricating grease.Approximately 100 <br /> gallons of diesel fuel and gasoline will be stored in fuel delivery systems on the drill rig and support vehicles. <br /> Approximately 50 pounds of lubricating grease will be stored on the drill rig or transported by drill trucks.In the event <br /> that hazardous or regulated materials were spilled, measures will be taken to control the spill and the BLM and the <br /> California Environmental Protection will be notified as required. <br /> G. New Roads: <br /> Length (ft): Width (ft): <br /> Significantly <br /> Upgraded Roads Length (ft): 1000 Width (ft): 8 <br /> Are culverts or other crossings proposed? If so,please describe: <br /> No culverts. <br /> H. Total project area to be disturbed (acres) 0.3 Acres <br /> I.Describe the equipment to be used for the prospecting operations: <br /> One (1)Track mounted LF-90 type RC drill <br /> One (1)water truck <br /> Three (3)4 x 4 pickups <br /> One (1) mud mixing units and tank <br /> One (1) mud pump <br /> 50 feet of HWT casing <br /> Form 2—Public File Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.