My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-05_REVISION - M2007050
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007050
>
2025-05-05_REVISION - M2007050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 9:22:08 AM
Creation date
5/5/2025 10:49:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007050
IBM Index Class Name
Revision
Doc Date
5/5/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Dale Yocam Yocam Stone LLP
Type & Sequence
SI1
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br /> Task description: Break up limestone to aid in 3:1 slope <br /> Site: Buffalo Stone Quarry Permit Action: 2025 Inspection Permit/Job#: M2007050 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 3/17/2025 County: Las Animas Filename: 3 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU Horsepower: 310 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $173.32 NA <br /> Operating Cost/Hour: $109.71 100 <br /> Ripper Ownership Cost/Hour: $14.53 NA <br /> Ripper Operating Cost/Hour: $7.95 100 <br /> Operator Cost/Hour: $38.59 NA <br /> Total Unit Cost/Hour: $344.10 <br /> Total Fleet Cost/Hour: $344.10 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 3.00 acres Rip Depth(ft): 2.00 Volume: 9,680 BCY or CCY <br /> Source of estimated quantity: Ripping highwall areas to help aid in 3:1 slopes <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 2.56 feet/pass <br /> Average Ripping Width: 7.08 feet/pass <br /> Average Ripping Length: 155.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.752 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.752 Acres/hr <br /> Site Altitude: 5,170 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.62 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.62 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 4.81 Hours <br /> Unit cost: $551.657 Per acre Total job cost: $1,655 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.