Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: 2025 Reclamation Cost Summary-Buffalo Stone Quarry <br /> Site: Buffalo Stone Quarry Permit Action: 2025 Inspection Permit/Job#: M2007050 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 3/17/2025 County: Las Animas Filename: M050-000 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Backfill and grade hi hwall to 31-1:1V DOZER 1 4.24 $1,457 <br /> 002 Replace topsoil DOZER 1 26.89 $9,253 <br /> 003 Break up limestone to aid in 3:1 sloe RIPPER 1 4.80 $1,655 <br /> 004 Reve etation of 9.6 acres REVEGE 1 10.00 $18,511 <br /> 005 Mobilization and demobilization MOBILIZE 1 10.60 $5,974 <br /> SUBTOTALS: 56.53 $36,850 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $744 <br /> Performance bond: 1.05 Total= $387 <br /> Job superintendent: 28.27 Total= $2,241 <br /> Profit: 10.00 Total= $3,685 <br /> TOTAL O&P= $7,057 <br /> CONTRACT AMOUNT(direct+O&P)= $43,907 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $1,866 <br /> Reclamation management and/or administration: 5.00 $2,195 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $11,618 <br /> TOTAL BOND AMOUNT(direct+indirect)= $48,468 <br />