Laserfiche WebLink
Surface Blasting Work Cont'd Task#001 Page 2 of 3 <br /> BLASTING MATERIALS QUANTITIES <br /> UANTITY UNIT <br /> Total Quantity of Stemming Required: 9.93 cubic yards <br /> Total Quantity of Explosives Required: 2,665 pounds <br /> Total Quantity of det.cord/fuse/wire Required: 3,968 linear feet <br /> Quantity of Blasting Caps per Blasthole: 1 cap(s) <br /> Total Quantity of Blasting Caps Required: 184 caps <br /> Quantity of Primers per Blasthole: 1 primer(s) <br /> Total Quantity of Primers Required: 184 primers <br /> Quantity of Delays per Blasthole: 1 delay(s) <br /> Total Quantity of Delays Required: 186 delays <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Descri tion <br /> Drilling Equipment-Drill: SCHRAMM T450WS <br /> -Drill Pad Preparation: Cat D8T-8SU <br /> Misc.Drill Support Equipment: NA <br /> Misc.Explosives Support Equipment: NA <br /> Explosives Delivery-Bulk Truck: ANFO Bulk Delivery Truck <br /> -Cap Truck: rCap Delivery Truck <br /> Drilling Drill Pad Misc.Drill Misc.Expl. Explosives Delivery <br /> Cost Breakdown: Equipment Preparation Support Support Bulk Truck Cap Truck <br /> Drilling Dozer MiscTruck MiscTruck <br /> %Utilization-machine: 100 25 NA NA 25 25 <br /> Ownership cost/hour: $293.57 $173.32 NA NA $131.01 $9.32 <br /> Operating cost/hour: $215.68 $27.43 NA NA $35.44 $9.47 <br /> %Utilization-ripper: NA 15 NA NA NA NA <br /> Ripper own.cost/hour: NA $14.53 NA NA $0.00 $0.00 <br /> Ripper op.cost/hour: NA $1.19 NA NA $0.00 $0.00 <br /> Operator cost/hour: $78.71 $38.59 NA NA $27.68 $27.68 <br /> Unit Subtotals: $587.96 $255.06 $0.00 $0.00 $194.13 $46.46 <br /> Number of Units: 1 1 0 0 1 1 <br /> Group Subtotals: $587.96 $255.06 $0.00 $0.00 $194.13 $46.46 <br /> Total work team cost/hour:$1,083.61 <br /> MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br /> Bulk ANFO nom.density( <br /> Blasting Agent: 7,900-15,000 fps) Pound $0.800 2665.082 $2,132.07 <br /> Cast primer, 1.0 lb(electric <br /> Primers or Boosters: or non-electric system) Each $14.810 184.000 $2,725.04 <br /> Non-electric cap,delay <br /> Blasting Caps: non-electric systems) Each $6.400 184.000 $1,177.60 <br /> Det.Cord,fuse,or Detonating cord,45 gr./ft. <br /> wire: non-electric systems) Linear foot $0.800 3968.140 $3,174.51 <br /> 1,000 MS delays(non- <br /> Delays: electric systems) Each $21.020 186.000 $3,909.72 <br /> NO MISCELLANEOUS <br /> Miscellaneous: MATERIALS REQUIRED NA $0.000 0.000 $0.00 <br /> Drill bits: Bit life= 1,750 Linear feet $1,825.64 0.681 $1,242.90 <br /> Total Materials Cost: $14,361.84 <br /> CIRCES Cost Estimating Software <br />