Laserfiche WebLink
RECEIVED <br /> MAY 0 2 2025 <br /> Other Reclamation Permits held by ProspectiveSuccessor applicable): <br /> if a� pp � Colorado Division of Reclamation, <br /> Mining and Saftey <br /> } <br /> { <br /> DESIGNATION UF„ tE_ TI VIEW E TIMLINE <br /> As explained above,the Permittee and Prospective Successor may waive their right to receive a <br /> decision on an Application within 30 days in order to allow the Division to calculate the required <br /> Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br /> one of the following two options to designate their choice. If Permittee and Prospective <br /> Successor cannot a ,the Division will render its decision within 30 days. <br /> I have reviewed the information provided in this Application <br /> p ittee Packet,as well as the applicable Act and Rules. Having been fully <br /> ' )(tll informed,I wish to WAIVE MY RIGHT TO A DECISION ON <br /> Prospec <br /> tive S ssor MY APPLICATION WITHIN 30 DAYS. <br /> I have reviewed the information provided in this Application <br /> Permittee Packet,as well as the applicable Act and Rules. Having been fully <br /> informed,I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties, <br /> Each Financial Warranty must be submitted on the Board's approved forms(available online at <br /> http.lrnining.state.eo.usfMineral%20Forms.htm). <br /> .6- <br />